Reporting All reports from inspections of the tanks should, as a minimum, include the following items: 38 1. Tank identity with information about materials, welds etc. 2. Date of inspection and years since the last inspection. 3. Areas of the tank inspected (map, drawing, description). 4. Map of identified defects from earlier inspections, both repaired and not repaired defects (weld defects from construction etc.). 5. Inspection method. 6. Inspector qualification data (if relevant). 7. Qualification information for the inspection method. 8. Reference to the evaluation report and/or inspection programme. 9. Findings with a map where defects are identified. 10. Reference to further investigations (if relevant). 11. Conclusion and recommendations for future inspection requirements
Dedicated Team spirit, Knowledge Sharing session and thanks to Greenko Founder, MD and CEO Shri Chalamalasetty Sir and Founder & president Shri Mahesh Koli SIr, AM Green management Shri Gautam Reddy, Shri GVS ANAND, Shri VIJAY KUMAR (Site Incharge), Shri G.B.Rao, Shri PVSN Raju, Dr. V. S. John, Shri V. Parmekar,Smt .Vani Tulsi,Shri B.B.K UmaMaheswar Rao, Shri P. Rajachand, Shri V. B. Rao, Shri. LVV RAO, Shri P.Srinivaslu Promotion- EHSQL-by Dr. A.N.GIRI- 29.1Lakhs Viewed Thanks to NFCL.
No comments:
Post a Comment