Reporting All reports from inspections of the tanks should, as a minimum, include the following items: 38 1. Tank identity with information about materials, welds etc. 2. Date of inspection and years since the last inspection. 3. Areas of the tank inspected (map, drawing, description). 4. Map of identified defects from earlier inspections, both repaired and not repaired defects (weld defects from construction etc.). 5. Inspection method. 6. Inspector qualification data (if relevant). 7. Qualification information for the inspection method. 8. Reference to the evaluation report and/or inspection programme. 9. Findings with a map where defects are identified. 10. Reference to further investigations (if relevant). 11. Conclusion and recommendations for future inspection requirements
ESMS-GIMS-SUSTAINIBILITY-EHSQL team building, AMGreen and GreenkoGroupFounder Dr.Anil Chalamalasetty and Dr.Mahesh Koli Sir, Shrimati Swathi Chalamalasetti, Dr. Rambabu P.,Shri H.Menon,Dr. Pradeep kumar, Shri G. Adiseshu, Shri Srinivasa Rao Ch., Shri N.Sesha Giri,Shri S.S.Basha,Shri Satish Babu, Shri Madhava, Shri Shri K.G. RAO, Shri KR Siva Kumar,Shri Badusha Vali, EHSQL by Dr.A.N.GIRI-74 Lakhs Viewed AM Green - Shri Gautam Reddy, Shri S Naidu, Shri GSV Raja AND GVS Anand
No comments:
Post a Comment