Monthly Production Report for February 2022
- Production of Crude Oil
Crude oil production[1] during February 2022 was 2272.26 TMT, which is 5.60% lower than target for the month and 2.19% lower than the production of February 2021. Cumulative crude oil production during April-February, 2021-22 was 27162.3 TMT, which is 4.71% and 2.57% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of February 2022 and cumulatively for April-February 2021-22 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company | Target | February (Month) | April-February (Cumulative) | ||||||
2021-22 (Apr-Mar)* | 2021-22 | 2020-21 | % over last year | 2021-22 | 2020-21 | % over last year | |||
Target* | Prod.* | Prod. | Target* | Prod.* | Prod. | ||||
ONGC | 20272.88 | 1555.93 | 1510.52 | 1544.84 | 97.78 | 18544.43 | 17769.62 | 18469.67 | 96.21 |
OIL | 3182.60 | 258.61 | 230.25 | 218.49 | 105.38 | 2893.63 | 2729.41 | 2687.75 | 101.55 |
PSC Fields | 7718.52 | 592.49 | 531.49 | 559.82 | 94.94 | 7067.77 | 6663.29 | 6722.53 | 99.12 |
Total | 31173.99 | 2407.03 | 2272.26 | 2323.15 | 97.81 | 28505.83 | 27162.32 | 27879.95 | 97.43 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
- Crude oil production by ONGC (Oil and Natural Gas Corporation) in nomination block during February 2022 was 1510.52 TMT, which is 2.92% lower than target of the month and 2.22% lower when compared with production of February 2021. Cumulative crude oil production by ONGC during April-February, 2021-22 was 17769.62 TMT, which is 4.18% and 3.79% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than anticipated production from WO-16 cluster due to delay in mobilization of MOPU Sagar Samrat.
- Less condensate receipt at Hazira due to less gas production from B&S Asset
- Crude oil production by OIL (Oil India Ltd) in the nomination block during February 2022 was 230.25 TMT, which is 5.38% higher when compared with production of February 2021 but 10.97% lower than target of the month. Cumulative crude oil production by OIL during April-February 2021-22 was 2729.41 TMT, which is 1.55% higher than the production during corresponding period of last year but 5.68% lower than target for the period. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells and drilling wells.
- Less than planned due to local disturbance & miscreants activities in main producing area (MPA).
- Crude oil production by Pvt/JVs companies in the PSC/RSC regime during February 2022 was 531.49 TMT, which is 10.29% lower than the target of the reporting month and 5.06% lower than the month production of February 2021. Cumulative crude oil production by Pvt/JVs companies during April-February 2021-22 was 6663.29 TMT, which is 5.72% and 0.88% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- MB/OSDSF/B80/2016 (Hindustan Oil Exploration Company Ltd.): Delay in commencement of production. Pre-commissioning in progress.
- RAVVA (Cairn Energy India Ltd): Production shortfall due to lower performance of wells RD-3ST and RD-6ST due to infectivity issues.
- CB-ONN-2004/2 (ONGC): Production shortfall due to less evacuation to IOCL due to leakage and choking in ONGC pipeline.
- CB-OS/2 ((Cairn Energy India Ltd): Production shortfall is due to natural decline and increase in water cut observed in aquifer supported pools and recent sanding/loading issues in the wells.
- Production of Natural Gas
Natural gas production during February 2022 was 2602.26 MMSCM, which is 12.79% higher than the production of February 2021 but 16.19% lower than the monthly target. Cumulative natural gas production during April-February 2021-22 was 31137.26 MMSCM, which is 19.82% higher than production during corresponding period of last year but 10.18% lower when compared with target for the period. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of February 2022 and cumulatively for April-February 2021-22 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (in MMSCM)
Oil Company | Target | February (Month) | April-February (Cumulative) | ||||||
2021-22 (Apr-Mar)* | 2021-22 | 2020-21 | % over last year | 2021-22 | 2020-21 | % over last year | |||
Target* | Prod.* | Prod. | Target* | Prod.* | Prod. | ||||
ONGC | 23335.10 | 1820.48 | 1581.80 | 1630.24 | 97.03 | 21309.09 | 18872.98 | 20040.29 | 94.18 |
OIL | 2949.65 | 225.86 | 219.30 | 187.88 | 116.72 | 2698.77 | 2642.04 | 2269.66 | 116.41 |
PSC Fields | 11834.60 | 1058.76 | 801.17 | 489.04 | 163.82 | 10659.43 | 9622.24 | 3676.86 | 261.70 |
Total | 38119.35 | 3105.09 | 2602.26 | 2307.16 | 112.79 | 34667.29 | 31137.26 | 25986.80 | 119.82 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
- Natural gas production by ONGC (Oil and Natural Gas Corporation) in the nomination blocks during February 2022 was 1581.80 MMSCM, which is 13.11% lower than target for the month and 2.97% lower than the production of February 2021. Cumulative natural gas production by ONGC during April-February, 2021-22 was 18872.98 MMSCM, which is 11.43% and 5.82% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than anticipated production from WO-16 cluster due to delay in mobilization of MOPU Sagar Samrat.
- Less than planned production from Vasistha /S1 wells in EOA due to certain reservoir related issues.
- Delay in commencement of gas production from U1 field of KG-98/2 Cluster-II due to covid impact as manufacturing of subsea items and well completion got delayed.
- Less production in Tapti-Daman block in B&S Asset due to more than anticipated decline.
- Production decline in Pasarlapudi field & delay of HF in Mandapeta field.
- Natural gas production by OIL (Oil India Ltd) in the nomination block during February 2022 was 219.30 MMSCM which is 16.72% higher than production of corresponding month of last year and 2.90% lower than the target for the month of current year. Cumulative natural gas production by OIL during April-February 2021-22 was 2642.04 MMSCM, which is 16.41% higher than production during corresponding period of last year but 2.10% lower than target for the period. Reasons for shortfall in production are as under:
- Less than planned contribution from drilling wells /old wells.
- Less offtake by the consumer (RRVUNL, Rajasthan) due to technical problem, unscheduled shutdown and damaged due to fire.
- Natural gas production by Pvt/JVs companies in the PSC/RSC/CBM regime during February 2022 was 801.17 MMSCM, which is 63.82% higher than the production of February 2021 but 24.33% lower than the target for the month. Cumulative natural gas production by Pvt/JVs during April-February, 2021-22 was 9622.24 MMSCM, which is 161.70% higher than production during corresponding period of last year but 9.73% lower than target for the period. Reasons for shortfall in production are as under:
- KG-DWN-98/2 (ONGC): Delay in commissioning of Well U1-A.
- KG-DWN-98/3 (RIL): Production shortfall due to well intervention jobs in some wells.
- RJ-ON-90/1 (Cairn Energy India Ltd): Few Gas wells of RDG field are not producing as per expectations.
- RANIGANJ EAST (Essar Oil and Gas Exploration and Production Ltd.): Shortfall because delay in scheduled operations. Reservoir uncertainties & well bore issues in certain areas of the field.
- RJ-ON//6 (FEL): Production shortfall due to less offtake by customer and natural decline in field.
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during February 2022 was 20443.03 TMT, which is 0.85% lower than target for the month but 9.81% higher than the February 2021. Cumulative crude processed during April-February 2021-22 was 219366.82 TMT, which is 1.04 and 9.25% higher than target for the period and production during corresponding period of last year respectively. Refinery-wise details of the crude throughput and capacity utilization during the month of February 2022 vis-à-vis February 2021 are given at Annexure-III and Annexure-IV. Company-wise crude throughput for the month of February 2021 and cumulatively for the period April-February 2021-22 vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed (Crude Throughput) (in TMT)
Oil Company | Target | February (Month) | April-February (Cumulative) | ||||||
2021-22 (Apr-Mar) | 2021-22 | 2020-21 | % over last year | 2021-22 | 2020-21 | % over last year | |||
Target* | Prod.* | Prod. | Target* | Prod.* | Prod. | ||||
CPSE | 143300.54 | 12979.96 | 12485.47 | 11729.41 | 106.45 | 129045.55 | 124359.71 | 114662.13 | 108.46 |
IOCL | 69120.46 | 6134.30 | 5785.13 | 5387.06 | 107.39 | 62325.86 | 61028.56 | 56423.74 | 108.16 |
BPCL | 29801.53 | 2571.00 | 2630.13 | 2674.16 | 98.35 | 26951.53 | 27048.16 | 23462.58 | 115.28 |
HPCL | 17751.16 | 1747.01 | 1508.95 | 1378.92 | 109.43 | 15817.71 | 12432.38 | 14843.59 | 83.76 |
CPCL | 9130.00 | 998.39 | 928.45 | 757.60 | 122.55 | 8131.60 | 7978.34 | 7279.35 | 109.60 |
NRL | 2840.00 | 224.00 | 234.05 | 227.10 | 103.06 | 2592.00 | 2436.23 | 2466.45 | 98.77 |
MRPL | 14594.35 | 1300.00 | 1392.27 | 1297.36 | 107.32 | 13169.35 | 13366.96 | 10113.16 | 132.17 |
ONGC | 63.04 | 5.26 | 6.48 | 7.21 | 89.97 | 57.51 | 69.07 | 73.27 | 94.27 |
JVs | 18079.47 | 1365.00 | 1604.32 | 614.84 | 260.93 | 16573.47 | 18640.58 | 14634.45 | 127.37 |
BORL | 7058.47 | 520.00 | 594.41 | 601.47 | 98.83 | 6488.47 | 6706.20 | 5587.50 | 120.02 |
HMEL | 11021.00 | 845.00 | 1009.92 | 13.37 | 7554.16 | 10085.00 | 11934.38 | 9046.95 | 131.92 |
Private | 78008.07 | 6273.16 | 6353.24 | 6273.16 | 101.28 | 71491.35 | 76366.53 | 71491.35 | 106.82 |
RIL | 60940.96 | 4876.36 | 4790.09 | 4876.36 | 98.23 | 56051.02 | 57892.32 | 56051.02 | 103.29 |
NEL | 17067.11 | 1396.79 | 1563.15 | 1396.79 | 111.91 | 15440.33 | 18474.21 | 15440.34 | 119.65 |
TOTAL | 239388.08 | 20618.12 | 20443.03 | 18617.41 | 109.81 | 217110.37 | 219366.82 | 200787.94 | 109.25 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure 3: Crude Oil Processed (Crude Throughput)
3.1 CPSE Refineries’ crude oil processed during February 2022 was 12485.47 TMT, which is 3.81% lower than target for the month but 6.45% higher than the production of February 2021. Cumulative crude throughput during April-February 2021-22 was 124359.71 TMT which is 8.46% higher than corresponding period of last year but 3.63% lower than target for the period. Reasons for shortfall in production are as under:
- IOCL-Guwahati, Haldia, Digboi Refinery: Monthly Crude processed in line of products demand.
- IOCL-Bongaigaon Refinery: Monthly Crude processed lower due to total power failure.
- HPCL, Visakh Refinery: Monthly Crude processed lower due to deferment of commissioning of new Crude Distillation Unit (CDU).
3.2 JV refineries’ crude oil processed during February 2022 was 1604.32 TMT, which is 17.53% higher than the target for the month and 160.93% higher than the production of February 2021. Cumulative crude throughput during April-February 2021-22 was 18640.58 TMT, which is 12.47% and 27.37% higher than target for the period and production during corresponding period of last year respectively.
3.3 Private refineries’ crude oil processed during February 2022 was 6353.24 TMT, which is 1.28% higher than the corresponding month of last year. Cumulative crude throughput during April-February 2021-22 was 76366.53 TMT, which is 6.82% higher than the corresponding period of last year.
- Production of Petroleum Products
- Production of Petroleum Products during February 2021 was 21151.70 TMT, which is 1.21% higher target for the month and 8.81% higher than the production of February 2021. Cumulative production during April-February, 2021-22 was 230158.29 TMT, which is 1.66% and 9.24% higher than target for the period and production during corresponding period of last year respectively. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of February 2021-22 and cumulatively for April-February, 2021 vis-à-vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
Figure 4: Monthly Refinery Production of Petroleum Products
Table 4: Production of Petroleum Products (TMT)
Oil Company | Target | February (Month) | April-February (Cumulative) | ||||||
2021-22 (Apr-Mar)* | 2021-22 | 2020-21 | % over last year | 2021-22 | 2020-21 | % over last year | |||
Target* | Prod.* | Prod. | Target* | Prod.* | Prod. | ||||
CPSE | 135423.57 | 11865.29 | 11549.95 | 11115.64 | 103.91 | 122383.61 | 117477.17 | 108596.79 | 108.18 |
IOCL | 65757.60 | 5593.87 | 5437.59 | 5134.48 | 105.90 | 59605.10 | 58443.15 | 54183.05 | 107.86 |
BPCL | 27811.21 | 2439.92 | 2416.11 | 2545.79 | 94.91 | 25135.95 | 25709.44 | 22381.76 | 114.87 |
HPCL | 16583.96 | 1633.88 | 1336.84 | 1316.68 | 101.53 | 14776.58 | 11510.78 | 13897.04 | 82.83 |
CPCL | 9279.11 | 781.15 | 876.54 | 717.04 | 122.24 | 8414.27 | 7331.64 | 6672.73 | 109.87 |
NRL | 2839.03 | 223.92 | 235.30 | 222.32 | 105.84 | 2591.12 | 2400.38 | 2489.99 | 96.40 |
MRPL | 13092.62 | 1187.55 | 1241.45 | 1172.80 | 105.85 | 11805.85 | 12015.95 | 8902.39 | 134.97 |
ONGC | 60.02 | 5.00 | 6.12 | 6.53 | 93.79 | 54.75 | 65.83 | 69.82 | 94.29 |
JVs | 16813.56 | 1236.16 | 1459.40 | 560.11 | 260.56 | 15397.18 | 17214.06 | 13562.22 | 126.93 |
BORL | 6547.56 | 485.16 | 565.49 | 541.06 | 104.52 | 6015.18 | 6007.18 | 4909.48 | 122.36 |
HMEL | 10266.00 | 751.00 | 893.92 | 19.05 | 4692.97 | 9382.00 | 11206.87 | 8652.75 | 129.52 |
Private | 93222.97 | 7459.64 | 7849.49 | 7459.64 | 105.23 | 84669.54 | 91743.36 | 84669.54 | 108.35 |
RIL | 76683.16 | 6100.06 | 6349.35 | 6100.06 | 104.09 | 69702.65 | 73998.58 | 69702.65 | 106.16 |
NEL | 16539.81 | 1359.58 | 1500.14 | 1359.58 | 110.34 | 14966.89 | 17744.77 | 14966.90 | 118.56 |
Total Refinery | 245460.10 | 20561.09 | 20858.84 | 19135.39 | 109.01 | 222450.33 | 226434.58 | 206828.56 | 109.48 |
Fractionators | 4331.28 | 338.15 | 292.86 | 303.64 | 96.45 | 3947.78 | 3723.71 | 3854.59 | 96.60 |
TOTAL | 249791.38 | 20899.24 | 21151.70 | 19439.03 | 108.81 | 226398.11 | 230158.29 | 210683.15 | 109.24 |
Note: Totals may not tally due to rounding off. *: Provisional
- Production of petroleum Products by Oil’s Refineries during February 2022 was 20858.84 TMT, which is 1.45% higher than target for the month and 9.01% higher than the production of February 2021. Cumulative production during April-February, 2021-22 was 226434.58 TMT, which is 1.79% and 9.48% higher than target for the period and production during corresponding period of last year respectively.
- Production of petroleum Products by Fractionators during February 2022 was 292.86 TMT, which is 13.39% lower than the target for the month and 3.55% lower than production of February 2021. Cumulative production during April-February, 2021-22 was 3723.71 TMT, which is 5.68% and 3.40% lower than target for the period and production during corresponding period of last year respectively.