Saturday, 20 September 2014

Sembmarine Kakinada, India – One-Stop Integrated Marine Facility


Sembmarine Kakinada, a joint venture between Sembawang Shipyard Pte Ltd and Kakinada Seaports Limited, is an integrated marine and offshore facility strategically located in the East Coast of India, catering to offshore drilling units and merchant vessels trading or operating in the waters off Indian Coast, one of the world’s key oil and gas exploration areas. SKL is operating within the vicinity of Kakinada Seaports and will be developed in 3 phases to offer shipowners and offshore operators, a one-stop integrated offshore
service
facility by 2012, including the repairs and servicing of offshore vessels and ships, newbuildings, riser/equipment repairs and modules fabrication.
Strategic Location
SKL is strategically situated between Visakhapatnam and Chennai Ports, a dynamic gateway on the Indian Coast
 
Aerial View of Sembmarine Kakinada facilities
Key Facts of Sembmarine Kakinada
Management Team and Workforce
  •  Strong management team and skilled labour from Sembawang Shipyard, Singapore
  •  ISO 9001 : 2008 & OHSAS 18001:2007 certified
Operations
  • Round-the-clock operations
Facilities
  • Floating Dock (190 m x 32.3 m, 6.0 m maximum draft) with 13,500 ton lifting capacity (operational by August 2012)
  • Deep and sheltered water depths up to 12.5 m
  • 635 x 25 meter repair pier with 2 x 50 tons luffing cranes
  • 2 x 250 tons crawlers
  • 150 ton heavy transporter, 3-6 ton forklifts, 14-21 meter cherry pickers and 15 – 25 tons mobile cranes
  • Riser repair & re-certification shop
  • Tubular repair & drill stem components manufacturing shop
  • Mechanical engineering workshop
  • Electrical engineering workshop
  • Riser blasting & painting shop
  • Steel workshop with CNC cutting machine, plate rolling machine plate forming machine and profile bending machine
  • Enclosed blasting & painting chamber with dust containment system
  • Multi-purpose workshop
  • Outfitting & piping workshops
  • Fabrication workshops with jibs and A frame supports
  • Ship, Offshore Repair & Conversion Facilities
  • Up to 20,000 dwt newbuilding facilities
Development Plans
  • 3-phase development programme over 5 years
  • One-stop integrated offshore service facilities by 2012

Sembmarine Kakinada Floating Dock (200 m x 32.2 m) Fabrication Workshop
OSV Repair Jetty SKL NRW Pier with OSV Jetty
Riser repairs in workshop Tail shaft removal in dock


Regular & Hassle-free logistics support from Kakinada Seaports
  • Round-the-clock operations
  • Channel depth of 12.5 m
  • Spacious & secured warehouses and storage facilities
  • Efficient cargo evacuation with rail/ road linkage
  • Cargo weighment by 2 x 80 tons Electronic Weigh Bridges
  • EDI connected in-house custom clearance support
 Contacts
Mr M K Lee, General Manager – mklee.skl@sembkakinada.com
Mr CG Neo, Executive Director - choongee.neo@sembmarine.com
Mr Roy Varghese, Sales Manager - roy.varghese@sembmarine.com

No comments:

Post a Comment