Shri SKB Valli Sir increasing monitoring system.
The 1000 MW Pinnapuram Solar Project—part of a larger integrated renewable energy project—requires a strict monitoring strategy focusing on environmental compliance (water, air, noise), high-standard HSE (hot weather, electrical safety), and maximized production efficiency. Key actions include monthly environmental monitoring, continuous SCADA-based performance monitoring, and rigorous safety protocols.
Environmental Management Strategy
Air & Noise: Implement regular monitoring of Ambient Air Quality (AAQ) and Noise Levels (monthly) near dust-generating points, following CPCB guidelines, and use water sprinkling for dust suppression.
Water Quality: Monitor water quality, specifically monitoring runoff from the site, as indicated in environmental clearance documents.
Waste Management: Implement a waste management plan for the construction/demolition waste and sewage sludge from labor colonies.
Land Use: Manage the 714 hectares of land required for the project and ensure proper rehabilitation and resettlement, along with compensatory afforestation for any removed green belt.
Health, Safety, and Environment (HSE) Plan
Safety Protocols: Develop an emergency response plan, conduct regular mock drills, and ensure strict compliance with electrical safety guidelines during the operational phase.
Occupational Health: Mitigate risks associated with working in extreme heat, such as that experienced in the Kurnool area, including providing adequate hydration and shade for workers.
Training: Provide safety training for all staff regarding hazards, including electrical risks and site-specific environmental hazards.
Production & Quality Monitoring Plan
Performance Tracking: Utilize a SCADA (Supervisory Control and Data Acquisition) system for real-time monitoring of energy production, panel efficiency, and inverter performance.
Component Monitoring: Monitor the degradation of solar modules and inspect for physical damage, particularly tracking any structural issues, given the high-capacity nature of the project.
Grid Compliance: Ensure the 1000 MW plant maintains output according to the 24/7 or 18/12-hour operational requirement of the integrated pump storage project.
Monitoring Frequency and Reporting
Environmental Data: Detailed data collection of environmental parameters will be prepared on a monthly basis, as per this Greenko Group report.
Compliance Reports: Submit half-yearly compliance reports regarding the environmental management plan to relevant authorities, note Greenko's half-yearly reports.
Investment: A substantial portion of the project cost, approximately ₹105.6784 Crore, is allocated for capital Environmental Management and another ₹12.7171 Crore annually for the Environment Management Plan (EMP
No comments:
Post a Comment