NFCL thankful to beloved SIRS-Shri K.S RAJU, Shri US JHA Chairman, Shri RAHUL RAJU–MD , SHRI RM DESHPANDE, Shri R.RAGHAVAN, Shri GVS ANAND, SHRI VIJAY KUMAR (Site Incharge), Shri G.B.Rao Shri PVSN Raju, Dr. V. Sunny John, Shri KS Gunasekhar , Shri IVSN Raju.Shri MSRKS Prasad, Shri D.Mohanty , Shri Uma Maheswar Rao, Shri T. Govind Babu, Shri. LVV RAO, Shri. DV Reddy, Promotion- EHSQ-Industry by Dr. A.N. GIRI- SPECIAL THANKS TO BELOVED DYNAMIC MD-SHRI RAHUL RAJU SIR-25.3 LAKHS EHSQ Viewed.
Saturday 7 April 2018
Fire and Gas Systems Loop Checks Procedure Instrumentation Tools
Fire and Gas Systems Loop Checks Procedure Instrumentation Tools: Guidelines to be followed by Panel Engineer during FGS Loop Checks: 1. Location of the FGS Tag no. to be checked (As per Drawing, it should be on that particular area or near the particular equipment) 2. Tag number & Description of the Tag to be checked. 3. Range of that Particular instrument to be ...