Dedicated and thanks to Greenko group CEO &; MD Shri Chalamalasetty Sir and Shri Mahesh Koli SIr, AM Green Ammonia (India) management Shri Gautam Reddy, Shri GVS ANAND, Shri K.Pradeep Mahadev, Shri VIJAY KUMAR (Site Incharge), Shri G.B.Rao, Shri PVSN Raju, Dr. V. Sunny John, Shri V. Parmekar ,Smt .Vani Tulsi,Shri B. B.K Uma Maheswar Rao, Shri T. Govind Babu, Shri P. Rajachand, Shri B.V Rao, Shri. LVV RAO ,Shri P.Srinivaslu Promotion- EHSQL-by Dr. A.N.GIRI- 28 Lakhs Viewed Thanks to NFCL.
Saturday 7 April 2018
Fire and Gas Systems Loop Checks Procedure Instrumentation Tools
Fire and Gas Systems Loop Checks Procedure Instrumentation Tools: Guidelines to be followed by Panel Engineer during FGS Loop Checks: 1. Location of the FGS Tag no. to be checked (As per Drawing, it should be on that particular area or near the particular equipment) 2. Tag number & Description of the Tag to be checked. 3. Range of that Particular instrument to be ...
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment