| Project Name: | Project Location: |
| Completed by: | Date: |
STATIONARY SCAFFOLD INSPECTION CHECKLIST
|
YES
|
NO
|
ACTION/COMMENTS
| |
| Scaffold components and planking in safe condition for use and planks graded for scaffold use? | |||
| Frame spacing and sill size capable of carrying intended loading? | |||
| Competent person in charge of erection and to inspection? | |||
| Sills properly placed and adequate sized? | |||
| Screw jacks been used to level and plumb scaffold instead of unstable objects? | |||
| Base plates and/or screw jacks in firm contact with sills and frame? | |||
| Scaffold is level and plumb? | |||
| Scaffold legs braced with braces properly attached? | |||
| Guard railing in place on all open sides and ends? | |||
| Overhead protection or wire screening been provided where necessary? | |||
| Scaffold been tied to structure at least every 30' in length and 26' in height? | |||
| Free standing towers been guyed or tied every 26' in height? | |||
| Brackets, tube and clamp, and accessories been properly placed with nuts and bolts tightened? | |||
| Scaffold free of makeshift devices or ladders to increase height? | |||
| Planks have minimum 12" overlap and extend 6" beyond supports? | |||
| Toe boards properly installed? | |||
| Conditions such as power lines, wind loading, etc. controlled? | |||
| Safe way to get on and off the scaffold without climbing on cross braces? | |||
| Front face within 14 inches of the work or within three feet for outrigger scaffolds? |
No comments:
Post a Comment