Reporting All reports from inspections of the tanks should, as a minimum, include the following items: 38 1. Tank identity with information about materials, welds etc. 2. Date of inspection and years since the last inspection. 3. Areas of the tank inspected (map, drawing, description). 4. Map of identified defects from earlier inspections, both repaired and not repaired defects (weld defects from construction etc.). 5. Inspection method. 6. Inspector qualification data (if relevant). 7. Qualification information for the inspection method. 8. Reference to the evaluation report and/or inspection programme. 9. Findings with a map where defects are identified. 10. Reference to further investigations (if relevant). 11. Conclusion and recommendations for future inspection requirements
Dedicated and thanks to Greenko group CEO and MD Shri Chalamalasetty and Shri Mahesh Koli SIr- AM Green Ammonia (India) management and Shri GVS ANAND, Shri K.Pradeep Mahadev, Shri VIJAY KUMAR (Site Incharge), Shri G.B.Rao, Shri PVSN Raju, Dr. V. Sunny John, Shri Vasant Parmekar ,Smt .Vani Tulsi,Shri B. B.K UmaMaheswar Rao, Shri T. Govind Babu, Shri P. Rajachand,Shri. LVV RAO ,Shri P.Srinivaslu Promotion- EHSQL-by Dr. A.N. GIRI- SPECIAL THANKS Greenko group 27.3 Lakhs Viewed Thanks to NFCL.
No comments:
Post a Comment