Sunday, 22 January 2017

Production Performance of Oil & Natural Gas Sector for December, 2016

Ministry of Petroleum & Natural Gas19-January, 2017 16:58 IST
Production Performance of Oil & Natural Gas Sector for December, 2016

Crude Oil
1.            Crude oil production during December 2016 was 3055.07 TMT which is 3.15% and 0.80% lower than target and production achieved in December 2015 respectively. Cumulative crude oil production during April-December, 2016 was 27045.34 TMT which is 1.92% and 3.23% lower than target and production during corresponding period of last year respectively. Unit-wise and state-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of December, 2016 and cumulatively for the period April-December, 2016 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.

Table-1: Crude Oil Production (in TMT)
Oil Company
Target
December (Month)
April-December (Cumulative)
2016-17 (Apr-Mar)
2016-17
2015-16
% over last year
2016-17
2015-16
% over last year
Target
Prod.*
Prod.
Target
Prod.*
Prod.
ONGC
22766.00
1931.11
1904.60
1895.70
100.47
16872.80
16629.09
16879.30
98.52
OIL
3480.00
312.41
280.59
270.12
103.87
2513.21
2430.46
2450.61
99.18
PSC Fields
10839.32
911.03
869.89
913.85
95.19
8189.45
7985.79
8617.95
92.66
Total
37085.32
3154.55
3055.07
3079.67
99.20
27575.46
27045.34
27947.86
96.77
            *: Provisional



Figure-1: Monthly Crude Oil Production
 

Unit-wise production details with reasons for shortfall have been given in following sub-sections:



1.1        Crude oil production by ONGC during December, 2016 was 1904.60 TMT which is 1.37% lower than the monthly target but 0.47% higher when compared with December 2015. Cumulative crude oil production by ONGC during April-December, 2016 was 16629.09 TMT which is 1.44% lower than target for the period and 1.48% lower than production during corresponding period of last year. Shortfall in production was mainly due to less than planned production from marginal fields of Mumbai High and natural decline in matured fields of western offshore.

1.2        Crude oil production by OIL during December, 2016 was 280.59 TMT which is 10.18% lower than monthly target but 3.87% higher than production in December 2015. Cumulative crude oil production by OIL during April-December, 2016 was 2430.46 TMT which is 3.29% lower than target for the period and 0.82% lower than production during corresponding period of last year. Shortfall in production was mainly due to less than planned contribution from high producing areas like Greater Hapjan, Greater Chandmari fields & Naharkatiya fields on account of rise in water cut and less than envisaged contribution from newly drilled wells.

1.3        Crude oil production by Pvt/JVs during December 2016 was 869.89 TMT which is 4.52% lower than the monthly target and 4.81% lower than December, 2015. Cumulative crude oil production by Pvt/JVs during April-December, 2016 was 7985.79 TMT which is 2.49% lower than target for the period and 7.34% lower than the production during corresponding period of last year. Reasons for shortfall in production are as under:

Ø  RJ-ON-90/1: Plant tripped on 16.12.16, stopping production from Mangala & Aishwarya. Increase in water cut in Mangala wells, poor reservoir performance of Bhagyam
Ø  Natural Decline in Ravva & CB-OS/2
Ø  Closure of 1 well in MA field in KG-DWN-98/3

Natural Gas
2              Natural gas production during December 2016 was 2736.80 MMSCM which is 9.68% lower than the target for the month and 0.01% lower than the production in December 2015. Cumulative natural gas production during April-December, 2016 was 23885.34 MMSCM which is 5.04% lower than target for the period and 3.29% lower than the production during corresponding period of last year. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of December, 2016 and cumulatively for the period April-December, 2016 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.



            Table-2: Natural Gas Production (MMSCM)
Oil Company
Target
December (Month)
April-December (Cumulative)
2016-17 (Apr-Mar)
2016-17
2015-16
% over last year
2016-17
2015-16
% over last year
Target
Prod.*
Prod.
Target
Prod.*
Prod.
ONGC
22743.43
2040.57
1926.75
1818.99
105.92
16724.08
16420.24
16272.14
100.91
OIL
2950.03
246.84
246.50
266.10
92.63
2260.52
2211.56
2120.06
104.32
PSC Fields
8425.44
742.87
563.56
651.89
86.45
6167.70
5253.54
6304.94
83.32
Total
34118.90
3030.28
2736.80
2736.98
99.99
25152.31
23885.34
24697.14
96.71
   *: Provisional

Figure-2: Monthly Natural Gas Production


2.1        Natural gas production by ONGC during December, 2016 was 1926.75 MMSCM which is 5.58% lower than the monthly target but 5.92% higher when compared with December 2015. Cumulative natural gas production by ONGC during April-December, 2016 was 16420.24 MMSCM which is 1.82% lower than the cumulative target but 0.91% higher than the production during the corresponding period of last year. Shortfall in production was mainly due to decline in reservoir pressure in Bassein field and less production from Daman & C-26 Cluster due to evacuation constraint as export lines to TCPP platform is not yet completed.

2.2        Natural gas production by OIL during December, 2016 was 246.50 MMSCM which is 0.14% lower than the monthly target and 7.37% lower than December 2015. Cumulative natural gas production by OIL during April-December, 2016 was 2211.56 MMSCM which is 2.17% lower than the cumulative target but 4.32% higher than the production during the corresponding period of last year. Shortfall in production was mainly due to decline production potential in a few high producing gas wells due to unexpected subsurface problems like water and sand ingress.
2.3    Natural gas production by Pvt/JVs during December 2016 was 563.56 MMSCM which is 24.14% lower than the monthly target and 13.55% less when compared with December, 2015. Cumulative natural gas production by Pvt/JVs during April-December, 2016 was 5253.54 MMSCM which is 14.82% lower than the cumulative target and 16.68% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
Ø  Underperformance of wells in KG- OSN-2001/3.
Ø  Underperformance of Sohagpur West CBM block extended dewatering hampering production in Raniganj East CBM block.
Ø  Closure of 2 wells in D1D3 field in KG-DWN-98/3.
Ø  RJ-ON-90/1: Plant tripped on 16.12.16, stopping production from Mangala & Aishwarya. Increase in water cut in Mangala wells, poor reservoir performance of Bhagyam.
Ø  RJ-ON/6: Increase in Water cut in few wells.


Refinery Production (in terms of Crude oil processed)

3        Refinery production during December, 2016 was 21441.47 TMT which is 3.21% higher than the target for the month and 6.43% higher than the production during corresponding period of last year. Cumulative production during April-December, 2016 was 183886.03 TMT which is 2.16% higher than the target for the period and 7.82% higher than the production during corresponding period of last year. Unit-wise production is given at Annexure-III. Company-wise production for the month of December, 2016 and cumulatively for the period April-December, 2016 vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.

     Table 3: Refinery Production (TMT)
Oil Company
Target
December (Month)
April-December (Cumulative)
2016-17 (Apr-Mar)
2016-17
2015-16
% over last year
2016-17
2015-16
% over last year
Target
Prod.*
Prod.
Target
Prod.*
Prod.
PSUs
135565.03
11662.78
12098.44
10848.04
111.53
101443.29
102756.76
91957.50
111.74
IOCL
65100.00
5570.12
5682.22
4917.90
115.54
48452.12
48103.96
41673.52
115.43
BPCL
25250.15
1918.14
2307.73
2085.02
110.68
18608.79
19338.98
17931.32
107.85
HPCL
16800.29
1493.00
1620.20
1564.69
103.55
12735.45
13195.83
12534.06
105.28
CPCL
10250.00
934.81
747.45
520.89
143.49
8291.60
8166.69
6811.46
119.90
NRL
2670.00
267.67
257.01
229.21
112.13
2027.50
1960.56
1847.18
106.14
MRPL
15450.00
1475.00
1476.64
1523.24
96.94
11295.00
11927.50
11114.26
107.32
ONGC
44.59
4.05
7.19
7.08
101.55
32.83
63.23
45.70
138.36
JVs
15000.00
1321.02
1570.99
1436.55
109.36
11486.44
12696.91
12919.50
98.28
BORL
6000.00
525.00
623.73
501.65
124.34
4425.00
4677.93
4660.25
100.38
HMEL
9000.00
796.02
947.25
934.91
101.32
7061.44
8018.99
8259.25
97.09
Private
89852.65
7790.78
7772.04
7861.27
98.87
67064.48
68432.36
65666.43
104.21
RIL
69561.01
6080.79
5994.99
6080.79
98.59
51788.53
52641.83
51788.53
101.65
EOL
20291.64
1709.99
1777.05
1780.48
99.81
15275.94
15790.54
13877.90
113.78
TOTAL
240417.68
20774.58
21441.47
20145.86
106.43
179994.20
183886.03
170543.44
107.82
     *: Provisional

Figure 3: Monthly Refinery Production
 

3.1    PSU Refineries’ production during December, 2016 was 12098.44 TMT which is 3.74% higher than the target for the month and 11.53% higher than the production achieved in the corresponding month of last year.Cumulative production by PSU refineries during April-December, 2016 was 102756.76 TMT which is 1.29% higher than the target for the period and 11.74% higher than the production during corresponding period of last year. Reasons for shortfall of refinery production in some PSU refineries are as under:
v  IOCL, Paradip:  Throughput lower due to coke upliftment issue.
v  IOCL, Haldia:  Throughput is lower due to VGO stock build-up
v  IOCL, Guwahati/Digboi: Lower availability of Assam crude.
v  CPCL, Manali: Throughput of Manali Refinery lower than target due to 'Vardha' cyclone which hit the refinery on 12th Dec'16 and lead to water crises as all water sources were temporally shutdown.
v  CPCL, CBR: Lower throughput in CBR due to product evacuation constraints.
v  NRL, Numaligarh: Unplanned shutdown of DCU.

3.2    Production in JV refineries during December, 2016 was 1570.99 TMT which is 18.92% higher than the target for the month and 9.36% higher than the production achieved in the corresponding month of last year. Cumulative production by JVs refineries during April-December, 2016 was 12696.91 TMT which is 10.54% higher than the target for the period but 1.72% lower than the production during corresponding period of last year.
3.3    Production in private refineries during December, 2016 was 7772.04 TMT which is 0.24% lower than the target for the month and 1.13% lower than the production achieved in the corresponding month of last year. Cumulative production by private refineries during April-December, 2016 was 68432.36 TMT which is 2.04% higher than the target for the period and 4.21% higher than the production during corresponding period of last year.
3.4    Refinery-wise details of the capacity utilization and production of petroleum products during the month of December, 2016 and cumulatively for the period April-December, 2016 vis-à-vis April-December, 2015 are given at Annexures-IV and V respectively.
     
          Click here to see  Annexures-2
          Click here to see  Annexures-5

**********
RG/RK



(Release ID :157513)

No comments: