roject Name: | Project Location: |
Inspected by: | Date of Inspection: |
Type of Crane: | Capacity (Tons): |
Hoist # | Manufacture's Serial # |
MONTHLY HOIST HOOK INSPECTION REPORT
ITEM
|
DEFICIENCIES TO LOOK FOR
|
SATISFACTORY
|
UNSATISFACTORY
|
|
1
|
If hook throat throat opening has increased by 15%
|
|
|
|
2
|
Load bearing point has been worn by 10%, the hook must be replaced.
|
|
|
|
3
|
Inspect hook tip. If it is twisted by 10o or more the hook must be replaced.
|
|
|
|
4
|
Check for excessive damage from chemicals and for deformation and cracks.
|
|
|
|
5
|
Check for and replace damaged, inoperative, or missing hook latches.
|
|
|
Comments:
No comments:
Post a Comment