Greenko GAM Solar CBAMO Meet 31st October to 01st Nov ' 2025 held at Ghani Mega Cluster - Kurnool
EHSQLaw Greenko -AMGreen Group (Env-Energy,Health,Safety,Security ,Social Ac.Quality-Lab) Tech.Serv.
EHSQL team building , AMGreen and GreenkoGroupFounder Dr. Anil Chalamalasetty and Shri Mahesh Koli Sir,Shri Gautam Reddy,Dr.K.Pradeep,Dr. Rambabu P.,Shri H.Menon,Shri Ch.Srinivas Rao,Shri N. SeshaGiri, Shri GSV Raja,Shri GVS Anand,Shri K.GangadharRao, Shri A.Deshmukh, Dr.V.S.John,Shri Badusha V. Shaik,Shri S. Simhachalam, Shri PVSN Raju,Shri B.B.K U.Maheswar Rao,Shri S.Tatayya,Shri P.Nagaraju,Shri S.K. Dash,Shri CH ApplaRaju,Shri LVV Rao, Shri P. Srinivaslu, EHSQL by Dr.A.N.GIRI-36 Lakhs Viewed
Subscribe to:
Post Comments (Atom)



































The LOTOTO register number in a work permit system is a unique identifier assigned to an entry in a formal logbook or digital record used to track the application, verification, and removal of Lock-Out, Tag-Out, Try-Out (LOTOTO) procedures for specific equipment.
ReplyDeletePurpose
The primary purpose of the LOTOTO register number is to provide a traceable and auditable link between the general work permit and the specific energy isolation measures implemented, ensuring accountability and safety during maintenance or servicing activities.
It serves to:
Ensure accountability: The number helps track who applied and removed the locks and tags, and when.
Provide an audit trail: It creates a formal record for safety audits and regulatory compliance (e.g., OSHA standards).
Integrate safety systems: It acts as a cross-reference, ensuring the physical isolation (LOTOTO) is verified and documented before the work permit is officially released or authorized.
Prevent accidents: By formally documenting the isolation process, it helps prevent the accidental start-up of machinery or the release of stored hazardous energy (electrical, mechanical, hydraulic, etc.).
Information in the Register
The corresponding entry in the LOTOTO register typically includes details such as:
The unique register number itself.
The associated work permit number.
Details of the equipment being worked on.
Location of the isolation points.
Type and number of locks/tags applied.
The names and signatures of personnel involved in the LOTO application and removal process.
Dates and times of application and removal of each isolation.
Reason for the LOTO procedure.
Checking for a fire in a transformer involves using both traditional manual inspections and advanced detection systems. The latest incidents in solar plants have highlighted the need for early and accurate fire detection methods, as transformer fires in these facilities can escalate quickly.
ReplyDeleteQ&A on Checking for Fire in a Transformer
Q: What are the early visual and auditory warning signs of a potential transformer fire?
A: Key signs include:
Smoke or Oil Leaks: Any visible smoke or oil leaking/spraying from the tank, bushings, or pressure relief device is a critical sign.
Tank Deformation: Unusual bulging or swelling of the transformer tank walls indicates dangerous internal pressure buildup.
Oil Color Change: The insulating oil appearing dark, discolored, or muddy suggests severe thermal stress and potential breakdown.
Burning/Pungent Smell: A strong smell of burning paper, plastic, or hot oil/tar indicates severe internal overheating of insulation or fluid.
Abnormal Noises: Unusual humming, buzzing, or crackling sounds may indicate electrical discharge or arcing inside.
Q: What advanced technologies are used for early fire detection in transformers, particularly in solar plants?
A: Modern fire prevention relies heavily on integrated and proactive monitoring systems:
Fiber Optic Temperature Monitoring: Sensors embedded within the transformer (at winding hot spots, tap changer contacts, etc.) provide real-time thermal surveillance and can detect overheating hours before ignition. This method is intrinsically safe as it uses light, not electricity.
Dissolved Gas Analysis (DGA): Periodic or online DGA systems analyze gases (like hydrogen and hydrocarbons) dissolved in the insulating oil. Specific gas compositions indicate internal faults like overheating or arcing, offering an early warning.
Thermal Imaging (Infrared Cameras): Non-invasive IR cameras monitor surface temperatures for abnormal heating patterns or localized hot spots. These systems can be integrated with AI/ML for automated, real-time fire detection in video surveillance.
Buchholz Relays: These are standard devices on oil-filled transformers that detect gas accumulation or sudden oil flow caused by internal faults, triggering an alarm or de-energizing the unit.
Flame and Heat Detectors: Industrial-grade flame and rate-of-rise heat detectors are placed near the transformer to quickly respond to an actual fire, especially in outdoor or open environments where smoke might dissipate.
Q: What is the most crucial first step if a transformer fire is detected?
A: The most crucial and immediate step is to de-energize the transformer by quickly locating and operating the corresponding circuit breakers or switches to isolate both the high- and low-voltage sides. Personal safety is the top priority, and a safe distance should be maintained due to the risk of explosion or flying debris. Emergency services should be notified immediately.
Q: Can water be used to extinguish a transformer fire?
A: NEVER use water on an oil-filled transformer fire, as the oil floats on water and the water can conduct electricity, worsening the situation and posing an electrocution hazard. Specialized fire suppression systems use materials such as dry chemicals, CO2, foam, or a nitrogen injection system to displace oxygen and suppress the fire effectively.
👷 Option 1: Focus on the Importance of Toolbox Talks
ReplyDeleteCaption:
🛑 Stop! Before you start, take 5 minutes for safety. 🛑
Toolbox talks are those short, essential safety meetings conducted right before starting work. They aren't just a formality—they're your first line of defense against accidents.
Here are some of the HAZARDS we can prevent with effective talks:
Workers unaware of job-specific risks.
Miscommunication between the team.
Ignoring Permit-to-Work requirements.
And the best PRECAUTIONS to make your talks count:
✅ Focus on specific hazards for the job of the day.
✅ Encourage participation and feedback from the crew.
✅ Use visuals or demonstrations for clarity!
Safety is a team effort. What's the best safety tip you've ever heard in a toolbox talk? Share it below! 👇
🗣️ Option 2: Focus on Common Pitfalls (Hazards) and Solutions
Caption:
🚨 Is "Complacency" a hazard on your worksite? 🚨
Our safety image highlights some common dangers that a good toolbox talk can fix. Don't let these slip through the cracks:
As per Shri Saroj sir 5 s
ReplyDeleteIn a solar power plant, the Main Control Room (MCR), SCADA system, Battery Room, ACDB Room, and HT Panel are critical components for operation, monitoring, and safety, while 5S refers to a quality management methodology applied to the facility.
5S Methodology
5S is a lean management methodology originating from Japan, focused on creating an organized, clean, and safe work environment. Applying 5S in a solar plant involves:
Sort (Seiri): Removing unnecessary items from the work area.
Set in Order (Seiton): Organizing necessary items for easy access.
Shine (Seiso): Keeping the area clean and conducting regular inspections.
Standardize (Seiketsu): Implementing standard procedures to maintain the first three S's.
Sustain (Shitsuke): Ensuring these practices are maintained as a habit and continuously improved upon.
In a solar plant context, 5S improves operational efficiency, enhances safety in areas like the battery or MCR rooms, and simplifies maintenance activities.
To achieve success as a family in a complex and busy modern society, focus on prioritizing quality time, fostering open communication, setting clear boundaries, and offering unconditional support. These principles build the resilience and strong bonds needed to navigate external pressures and individual differences.
ReplyDeleteCore Strategies for Family Success
Prioritize Quality Time: In a busy world, the quality of time spent together is more important than the quantity.
Schedule dedicated "connection windows" like regular family dinners, game nights, or weekend activities, making them non-negotiable.
Make the most of everyday moments, such as car rides or doing chores together, by engaging in conversation and fun.
Minimize digital distractions by establishing "tech-free" zones or times (e.g., at the dinner table) to ensure everyone is present and engaged.
Foster Open and Honest Communication: Create a safe environment where everyone feels heard and respected without fear of judgment.
Practice active listening, giving your full attention, making eye contact, and reflecting back what you've heard to confirm understanding.
Use "I" statements to express feelings and needs without blame (e.g., "I feel sad when..." instead of "You always...").
Hold regular, light-hearted family meetings to discuss the week's ups and downs, plan activities, and address concerns collaboratively.
Establish Shared Values and Goals: Discuss and agree upon core family values (such as respect, empathy, honesty, and responsibility) to provide a shared moral compass in a complex society.
Work together toward common goals, like a family project or vacation, to foster a sense of teamwork and collective achievement.
Create and celebrate family traditions and rituals (e.g., unique birthday celebrations, holiday activities) that provide a sense of identity and belonging.
Provide Unconditional Support and Appreciation: A family should be a haven where members feel loved, valued, and encouraged to grow.
Show affection frequently through words of affirmation, hugs, and thoughtful gestures.
Support each other's individual interests and talents, attending events and cheering each other on.
Acknowledge and praise efforts and achievements, no matter how small, to build self-confidence and a positive atmosphere.
Manage Conflict Constructively: Disagreements are inevitable, but healthy resolution is key to strong bonds.
Address issues calmly, focusing on solutions rather than personal attacks or bringing up past offenses.
Teach and model patience and forgiveness, showing that the family stands together in difficult times.
Set healthy boundaries to ensure each person's need for personal space and privacy is respected.
EMERGENCY AND RESPONSE PLAN -PRATYASH
ReplyDelete________________________________________________________________________________
DOC. No. ERP-SOLAR O&M-PRPL DOCUMENT CLASSIFICATION INTERNAL
ISSUE No. 03 DATE OF ISSUE 30.01.2021 NEXT REVIEW (ON / BEFORE) 29.01.2023
REVISION. No. 00 DATE OF REVISION Page 2 of 42
Table of Contents
1 Introduction………………………………………………………………………………………………………………..….……3
2 Pratyash Emergency Preparedness and Response Plan…………………………………………….….………3
2.1 Emergency Preparedness ........................................................................................................................ ..3
2.2 Greenko Emergency Management Procedure .......................................................................................... ..4
2.3 Emergency response flow chart ............................................................................................................... ..5
2.4 Safe work practices ……………………………………………………………………………………………………………………….…………..5
2.5 Roles and responsibilities during emergencies .......................................................................................... ..5
2.6 Training and Mock drills .......................................................................................................................... ..7
2.7 Signage and display material ..................................................................................................................... ..8
3 List of formats / documents………………………………………………………………………………….……………8
4 Annexures…………………………………………………………………………………………………………..…..……….9
4.1 Annexure:1 PROFILE OF PRATYASH RENEWABLE PRIVATE LIMITED……………………………………………………....9
4.1.1 Plant Description .............................................................................................................................. .10
4.1.2 Pooling Station 220 KV and 33 KV internal…………………………………………………………………….11
4.2 Annexure: 2- Roles of Coordinators and special teams ........................................................................ .11
4.2.1 General Emergency Coordinator ........................................................................................................ .11
4.2.2 Specific oordinators……………………………………………………………………………………………………………….…...……..12
4.2.2.1 Transport coordinator(HR & ADMIN)……………………………………………………………………........12
4.2.2.2 Medical / hospital coordinator (HR & ADMIN) …………………………………………………….........12
4.2.2.3 Statutory (police/fire/security) coordinator (Plant In charge)……………………………………..12
4.2.2.4 Local emergency leader at each work location………………………….....................................12
4.2.2.5 Welfare coordinator (HR & ADMIN)………………………………….............................................13
4.2.3 Special teams………………………………………………………………………………………….……..……….....13
4.2.3.1 Electrical team …………………………………………………………………………………………….………..…...13
4.2.3.2 Rescue teams……………………………………………………………………………………….………………..…...13
4.2.3.3 Response Teams………………………………………………………………………………….……………….……..13
4.3 Annexure: 3 Identified Emergencies……………………………………………………………………………………………………14
ReplyDelete4.4 Annexure: 4 Emergency Actions……………………………………………………………………………………………..………....14
4.4.1 Emergency action plans during Fire(Grass Fire, Oil Fire , Cable Fire, electrical fire in panels, Transformer oil
Fire, Fire in administration building,) in the plant..........................................................................................14
4.4.2 Emergency action plan during Road Accidents of Vehicles…………………………………………….…….…………..…17
4.4.3 Emergency action plans during snake bites / scorpion / poisonous insect ………………………….….…………..19
4.4.4 Emergency action during Electrical Shock …………………………………………………..………………………….…….…….20
4.4.5 Emergency action during Heat Stroke ................................................................................................ ..22
4.4.6 Emergency action during fall from Height .......................................................................................... ..24
4.4.7 Emergency action during Epidemic/Contagious Disease(COVID -19)…………………………………………………….25
4.4.8 Emergency action during Major equipment failure………………………………………………………………………………28
4.4.9 Emergency action during Food Poisoning…………………………………………………………………………………………….30
4.4.10 Emergency action during Riot Local People…………………………………………………………………………………………31
4.4.11 Emergency action during Bomb threat………………………………………………………………………………………………..33
4.4.12 Emergency action during Natural Calamities(1.Earth quake 2.Heavy rains/Floods 3.Lightning and
thunderstorm……………………………………………………………………………………………………………………………………………………35
H&S PLAN SOLAR
ReplyDelete_________________________________________________________________________________
DOC. No. PRO-CO-HS-SOLAR DOCUMENT CLASSIFICATION PROTECTED
ISSUE No. 02 DATE OF ISSUE 01.08.2022 NEXT REVIEW (ON / BEFORE) 31.07.2024
REVISION NO. 00 DATE OF REVISION - Page 2 of 178
Table of Contents
1 Scope ............................................................................................................................................ 4
2 Normative references .................................................................................................................. 4
3 Terms and definitions .................................................................................................................. 4
3.1 Organization ........................................................................................................................ 4
3.2 Interested party / stakeholder ............................................................................................ 4
3.3 Worker ................................................................................................................................. 4
3.4 Participation ........................................................................................................................ 4
3.5 Consultation ........................................................................................................................ 4
3.6 Contractor ........................................................................................................................... 4
3.7 Legal requirements and other requirements ...................................................................... 4
3.8 H&S policy ........................................................................................................................... 5
3.9 H&S objective ...................................................................................................................... 5
3.10 Injury and ill health.............................................................................................................. 5
3.11 Hazard ................................................................................................................................. 5
3.12 H&S risk ............................................................................................................................... 5
3.13 H&S opportunity ................................................................................................................. 5
3.14 Competence ........................................................................................................................ 5
3.15 Documented information.................................................................................................... 5
3.16 H&S performance ................................................................................................................ 5
3.17 Outsource ............................................................................................................................ 5
3.18 Audit .................................................................................................................................... 5
3.19 Incident ................................................................................................................................ 5
3.20 Corrective action ................................................................................................................. 5
3.21 Continual improvement ...................................................................................................... 6
4 Context of the organisation ......................................................................................................... 8
ReplyDelete4.1 Understanding the organisation and its context ................................................................ 8
4.2 Understanding the needs and expectations of workers and other interested parties .... 11
4.3 Determining the scope of the H&S Management System ................................................ 12
4.4 H&S Management System ................................................................................................ 12
5 Leadership and Worker participation ........................................................................................ 12
5.1 Leadership and commitment ............................................................................................ 12
_________________________________________________________________________________
ReplyDeleteDOC. No. PRO-CO-HS-SOLAR DOCUMENT CLASSIFICATION PROTECTED
ISSUE No. 02 DATE OF ISSUE 01.08.2022 NEXT REVIEW (ON / BEFORE) 31.07.2024
REVISION NO. 00 DATE OF REVISION - Page 3 of 178
5.2 H&S policy ......................................................................................................................... 13
5.3 Organisational roles, responsibilities and authorities ...................................................... 15
5.4 Consultation and Participation of workers ....................................................................... 22
6 Planning...................................................................................................................................... 22
6.1 Actions to address risks and opportunities ....................................................................... 22
6.2 H&S objectives and planning to achieve them ................................................................. 37
7 Support....................................................................................................................................... 38
7.1 Resources .......................................................................................................................... 38
7.2 Competence ...................................................................................................................... 38
7.3 AwarenessGreenko Workers shall be made aware of: ..................................................... 40
7.4 Communication ................................................................................................................. 40
7.5 Documented information.................................................................................................. 45
8 Operation ................................................................................................................................... 47
8.1 Operational planning and control ..................................................................................... 47
Tools double insulated/ Earthed (if not double insulated) .................. Error! Bookmark not defined.
9 Performance evaluation .......................................................................................................... 164
9.1 Monitoring, measurement, analysis and performance evaluation ................................ 164
9.2 Internal Audit .................................................................................................................. 166
9.3 Management Review ...................................................................................................... 169
10 Improvement ........................................................................................................................... 172
10.1 General ............................................................................................................................ 172
10.2 Incident, nonconformity and corrective action .............................................................. 172
10.3 Continual improvement .................................................................................................. 173
An ISO 45001 audit for a solar plant evaluates the Occupational Health and Safety (OH&S) management system against standard requirements, with specific attention to solar-industry hazards like electrical risks, working at heights, and weather conditions. The checklist is structured around the main clauses of the standard (4 through 10).
ReplyDeleteBelow is a clause-wise guide to the key audit points, with specific considerations for a solar power plant environment.
Clause 4: Context of the Organization
The organization must define the internal and external issues, as well as the needs and expectations of workers and other interested parties (contractors, visitors, community), that affect OH&S.
Solar Plant Considerations:
External/Internal Issues: Are unique risks of the plant location considered (e.g., extreme heat, sun glare, lightning frequency, local wildlife)?
Interested Parties: Are the specific safety needs of maintenance contractors, panel cleaning crews, and visitors (e.g., specific PPE for high-voltage areas) identified?
Scope: Does the OH&S management system scope clearly cover all physical boundaries of the solar farm, including substations, inverters, panel arrays, and offices?
Clause 5: Leadership and Worker Participation
Top management must demonstrate leadership and commitment to the OH&S management system. Worker participation in safety matters is a key requirement.
Solar Plant Considerations:
Leadership Commitment: Is top management actively ensuring resources are available for solar-specific safety equipment (e.g., insulated gloves, arc flash protective gear, fall arrest systems)?
Worker Participation: Are there established mechanisms for workers (including contractors) to report incidents, hazards, or risks without fear of reprisal?
Roles & Responsibilities: Are roles, responsibilities, and authorities for safety clearly assigned and communicated, especially for multi-employer workplaces during construction or major maintenance?
Clause 6: Planning
The organization must plan to address risks and opportunities, determine legal requirements, and set measurable OH&S objectives.
Solar Plant Considerations:
Hazard Identification & Risk Assessment (HIRA): Does the HIRA process specifically address solar hazards like:
Electrical: Arc flash, electric shock from DC and AC systems, working on live parts.
Physical: Working at heights (rooftop or elevated structures), slips/trips on uneven ground or panel surfaces, manual handling of heavy panels.
Environmental: UV exposure, heat stress, snake/insect bites.
Mechanical: Pinch points during panel installation/maintenance, working with heavy machinery.
Legal Requirements: Are all applicable local and national legal requirements for electrical safety, construction safety, and environmental protection at a solar plant identified and documented?
OH&S Objectives: Are specific, measurable objectives set, e.g., "Reduce electrical incidents by 50% within 12 months"?
Clause 7: Support
This clause covers the resources, competence, awareness, communication, and documented information needed for the OHSMS.
Solar Plant Considerations:
Competence: Are workers handling electrical systems certified and specifically trained in solar PV safety procedures (e.g., Lockout/Tagout (LOTO) for solar inverters and equipment)?
Training: Is training on emergency procedures (e.g., responding to a fire involving live electrical components) provided and evaluated?
Documented Information: Are site-specific safety procedures, one-line diagrams, LOTO procedures, and safety data sheets (SDS) readily available and controlled?
Clause 8: Operation
This clause focuses on implementing operational planning and control, managing change, procurement, and emergency preparedness.
Solar Plant Considerations:
ReplyDeleteOperational Control: Are control measures effectively implemented, such as the use of engineering controls (e.g., ground-fault protection, access controls) before relying solely on PPE?
Management of Change (MoC): Is there a process to assess the OH&S impacts of changes (e.g., new panel technology, different inverter model, changes in site layout) before implementation?
Procurement/Contractors: Are safety requirements communicated to and verified for contractors (e.g., ensuring they have appropriate insurance, training, and safety plans for their work on site)?
Emergency Preparedness: Have emergency plans for specific scenarios like fire, electric shock, or severe weather (e.g., lightning storms) been developed, tested (drills), and communicated?
Clause 9: Performance Evaluation
The organization must monitor, measure, analyze, and evaluate its OH&S performance, conduct internal audits, and perform management reviews.
Solar Plant Considerations:
Monitoring & Measurement: Is OH&S performance tracked using relevant indicators, such as near-miss reporting rates for electrical hazards, frequency of safety walk-throughs, or lost time injury rates?
Compliance Evaluation: Is the organization regularly evaluating its compliance with applicable Indian electrical safety codes and regulations?
Internal Audits: Are internal audits conducted by impartial and competent auditors, and do they cover site-specific operations like the condition of earthing systems and the use of PPE?
Clause 10: Improvement
The organization must determine opportunities for improvement and implement necessary actions (corrective actions for incidents/nonconformities) to ensure continual improvement of the OHSMS.
Solar Plant Considerations:
Incident Investigation: Are all incidents, no matter how minor, thoroughly investigated to determine root causes and prevent recurrence?
Corrective Actions: Are actions taken to address nonconformities effective and documented?
Continual Improvement: Is the feedback from workers and performance data used to continuously enhance the safety culture and practices at the solar plant?
A generic, clause-wise ISO 45001 audit checklist can be adapted for a solar power plant's Health & Safety (H&S) plan. The audit should focus on specific solar plant hazards like electrical risks, working at height, and solar radiation exposure.
ReplyDeleteISO 45001 Clause-wise H&S Audit Checklist (Solar Plant Focus)
Clause Requirement Solar Plant Specific Audit Questions
4. Context of the Organization Determine internal/external issues and scope of the OH&S management system (OHSMS). Have we identified hazards specific to our solar site's location (e.g., extreme weather, specific environmental concerns)? Have we defined the boundaries of the OHSMS to include all solar panels, inverters, and associated infrastructure?
5. Leadership and Worker Participation Top management commitment, H&S policy, roles, and worker consultation. Is top management visibly committed to H&S, e.g., through resource allocation for safety equipment and training? Are workers, including contractors, consulted in hazard identification for new installations or maintenance procedures?
6. Planning Hazard identification, risk assessment, legal requirements, and H&S objectives. Are there proactive processes for identifying specific solar plant hazards (e.g., arc flash, working on fragile surfaces)? Do we maintain an up-to-date register of legal H&S requirements for the solar industry? Are there measurable OH&S objectives, such as reducing the number of 'working at height' incidents?
7. Support Resources, competence, awareness, communication, and documented information. Is specific training for electrical safety, solar panel maintenance, and emergency response provided and documented? Are H&S documents and procedures (e.g., Lockout/Tagout (LOTO) procedures) readily available and understood by all workers?
8. Operation Operational planning, hierarchy of controls, management of change, procurement, and emergency preparedness. Is the hierarchy of controls used to minimize electrical and fall hazards? Is there a process to manage H&S risks associated with new equipment, like new inverter models or cleaning systems? Are emergency drills conducted for incidents like fires or electric shocks on-site? Are contractors selected based on specific H&S criteria?
9. Performance Evaluation Monitoring, measurement, internal audit, and management review. Are H&S performance indicators (e.g., incident rates related to high-voltage work) monitored and analyzed? Are internal audits conducted at planned intervals by objective and impartial auditors? Are management reviews held to assess the ongoing suitability and effectiveness of the OHSMS?
10. Improvement Incident, nonconformity, and continual improvement. Is there a robust process for reporting and investigating all incidents and near misses, with corrective actions implemented effectively? Is there evidence of continual improvement in H&S performance and the overall OHSMS?
A solar plant audit is a structured review of technical, operational, and safety aspects to boost performance, ensure compliance, and extend asset life.
ReplyDeleteKey Audit Components:
Performance Analysis:
Check CUF, PR, Specific Yield vs. design.
Analyze daily, monthly, annual generation, inverter downtime, grid curtailments.
Identify soiling, shading, mismatch losses.
Monitor DC/AC losses, temperature effects, meter accuracy, auxiliary consumption.
System Inspection:
Inspect PV modules (cracks, hotspots), SCBs (fuses, SPD), inverters (logs, THD).
Check transformers (oil, IR), structure (corrosion), cabling, and cleaning systems.
Maintenance Review:
Validate preventive schedules, corrective logs.
Conduct IR thermography, SCB torque checks, battery room health, vegetation control.
Safety and Compliance:
Review HIRA, LOTO, PTW practices.
Check firefighting, PPE usage, arc flash safety, earthing, and LPS condition.
Data Monitoring:
Ensure SCADA health, data logging, alarm tracking, event management.
Store and Inventory Management:
Maintain critical spares, warranty tracking, consumables stock, proper storage, vendor support.
Audit Benefits:
Higher generation, lower losses, better safety, longer life, reduced O&M cost, regulatory compliance.
Massive Green Energy Push in Andhra Pradesh! 🌱⚡
ReplyDeleteThe Government of Andhra Pradesh and AM Green Group have signed MoUs worth ₹54,000 crore at the CII Partnership Summit in #Vizag.
Key Investments Announced:
🔹 ₹44,000 crore – Kakinada (Uppada)
• 1 MTPA Green Aluminium Complex (two phases)
• One of the world’s largest RFNBO-compliant Green Ammonia facilities (1 MTPA)
🔹 ₹10,000 crore – North Andhra (Srikakulam, Vizianagaram, Anakapalli)
• Multiple biorefineries producing 2G ethanol
• A 180 KTPA Sustainable Aviation Fuel (SAF) plant
• Building a complete “farm to flight” ecosystem
This transformative investment positions North Andhra Pradesh as a global hub for next-generation biofuels and green manufacturing.