Monthly Production Report for May,2019
Crude Oil
Table-1: Crude Oil Production (in TMT)
v RJ-ON-90/1 (CEIL): Deficit is from Mangla due to delay in 45 FM infills.
v Lower work over (WO) and production enhancement activities due to one work over rig being taken offline for mandatory maintenance and HSE compliance.
v Operational issues in Bhagyam, Aishwarya, ABHand RDG fields.
v CB-ONN-2005/9 (Mercator): Stoppage in from Jyoti-1 is stopped. Well closed for long term pressure build up study and could not be put back in production due to non-grant of EC for development campaign.
v The other discovery well, Jyoti-2 is not yet activated and is under WO from 31.03.19.
Natural Gas
Table 3: Refinery Production (TMT)
Note: Totals may not tally due to rounding off. *: Provisional
Figure 3: Monthly Refinery Production
- Crude oil production[1] during May,2019 was2800.12 TMT which is3.37% lower than target and6.91% lower when compared with May2018.Cumulative crude oil production during April-May, 2019 was 5518.61 TMT which is 1.92% lower than target for the period and6.82% lower than production during corresponding period of last year.Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of May, 2019 and cumulatively for the period April-May, 2019 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Oil Company
|
Target
|
May (Month)
|
April-May (Cumulative)
| ||||||
2019-20 (Apr-Mar)
|
2019-20
|
2018-19
|
% over last year
|
2019-20
|
2018-19
|
% over last year
| |||
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
| ||||
ONGC |
22153.90
|
1763.91
|
1759.58
|
1840.93
|
95.58
|
3456.28
|
3450.35
|
3618.26
|
95.36
|
OIL |
3424.90
|
284.90
|
273.95
|
285.02
|
96.12
|
561.29
|
539.16
|
559.36
|
96.39
|
PSC Fields |
9463.34
|
848.92
|
766.59
|
881.91
|
86.92
|
1608.95
|
1529.10
|
1745.17
|
87.62
|
Total |
35042.15
|
2897.74
|
2800.12
|
3007.86
|
93.09
|
5626.51
|
5518.61
|
5922.78
|
93.18
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
- Crude oil production by ONGC during May, 2019 was 1759.58 TMT which is marginally lower by 0.25%than the monthly target and4.42%lower when compared with May,2018. Cumulative crude oil production by ONGC during April-May, 2019 was 3450.35 TMT which is 0.17%lower than target for the period andlowerby 4.64% thanproduction during corresponding period of last year. Major reasons for lower production is less off take by consumers in Tripura, Cauvery & Rajahmundry.
- Crude oil production by OIL during May, 2019 was273.95 TMT which is 3.84%lower than monthly target and 3.88% lower when compared with May, 2018. Cumulative crude oil production by OIL during April-May, 2019 was 539.16 TMT which is 3.94% lower than target for the period and3.61%lower than production during the corresponding period of last year. Major reasons for lower production isless than planned contribution from work over wells and drilling wells.
- Crude oil production byPvt/JVs during May,2019 was 766.59 TMT which is 9.70%lower than the monthly target and 13.08%lowerthanMay, 2018.Cumulative crude oil production by Pvt/JVs during April-May, 2019 was 1529.10 TMT which is 4.96%lowerthan target for the period and 12.38% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
v RJ-ON-90/1 (CEIL): Deficit is from Mangla due to delay in 45 FM infills.
v Lower work over (WO) and production enhancement activities due to one work over rig being taken offline for mandatory maintenance and HSE compliance.
v Operational issues in Bhagyam, Aishwarya, ABHand RDG fields.
v CB-ONN-2005/9 (Mercator): Stoppage in from Jyoti-1 is stopped. Well closed for long term pressure build up study and could not be put back in production due to non-grant of EC for development campaign.
v The other discovery well, Jyoti-2 is not yet activated and is under WO from 31.03.19.
- The delay in drilling the new development well is primarily due to non-grant of EC for development campaign till date.
Natural Gas
- Natural gas production during May,2019 was 2738.92 MMSCM which is 0.4% higher when compared with May, 2018 but4.81% lower than the target for the month. Cumulative natural gas production during April-May, 2019 was 5394.81MMSCM which is marginally higher by 0.07% than the production during corresponding period of last yearbut 4.56% lower than target for the period.Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of May, 2019 and cumulatively for the period April-May, 2019 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (MMSCM)
Oil Company
|
Target
|
May (Month)
|
April-May (Cumulative)
| ||||||
2019-20 (Apr-Mar)
|
2019-20
|
2018-19
|
% over last year
|
2019-20
|
2018-19
|
% over last year
| |||
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
| ||||
ONGC |
25848.00
|
2132.22
|
2082.39
|
1981.56
|
105.09
|
4226.64
|
4120.10
|
3953.58
|
104.21
|
OIL |
3309.59
|
287.21
|
230.89
|
227.44
|
101.52
|
563.79
|
455.38
|
448.86
|
101.45
|
PSC Fields |
5395.20
|
457.99
|
425.64
|
519.00
|
82.01
|
862.32
|
819.34
|
988.51
|
82.89
|
Total |
34552.79
|
2877.42
|
2738.92
|
2728.00
|
100.40
|
5652.75
|
5394.81
|
5390.94
|
100.07
|
Note: Totals may not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
- Natural gas production by ONGC during May, 2019 was 2082.39 MMSCM which is 5.09% higher when compared with May, 2018but 2.34% lower than the monthly target. Cumulative natural gas production by ONGC duringApril-May, 2019 was 4120.10 MMSCM which is 4.21% higher than the production during the corresponding period of the last year but 2.52% lower than the cumulative target.
- Natural gas production by OIL during May, 2019 was 230.89 MMSCM which is 1.52% higher than May, 2018 but 19.61% lower than the monthly target. Cumulative natural gas production by OIL during April-May, 2019 was 455.38 MMSCM which is target 1.45% higher than the production during the corresponding period of last year but 19.23% lower than the cumulative.Major reason for lower production is loss of potential in Deohal area due to presence of CO2 in production stream and blockade in operational areas.
- Natural gas production by Pvt/JVs during May,2019 was 425.64 MMSCM which is 7.06% lower than the monthly target and17.99% lower when compared with May, 2018. Cumulative natural gas production by Pvt/JVs during April-May, 2019 was 819.34MMSCM which is 4.98% lower than the cumulative target and17.11% lower than the production during the corresponding period of last year. Reasons for shortfall in production are as under:
- KG-DWN-98/3 (RIL): MA field ceased production and closure of 2 wells in D1D3 field.
- KG-OSN-2001/3 (ONGC): Delay inanticipated production from well DDW D-5.
- AAP-ON-94/1 (HOEC): Less Production due to low consumer demand.
- Raniganj East CBM Block (ESSAR): Few wells closed for planned maintenance and refrac jobs. Major customer 'Matix' operational shutdown.
- Refinery Production (in terms of crude oil processed)
Refinery production during May, 2019 was 21577.85TMT which is 0.51% lower than the target for the month and2.98% lowerwhen compared with May, 2018. Cumulative production during April-May, 2019 was 42280.91 TMT which is 1.61% higher than the target for the period and0.44% higher than the production during corresponding period of last year. Unit-wise production is given at Annexure-III. Company-wise production for the month of May, 2019 and cumulatively for the period April-May, 2019 vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Refinery Production (TMT)
Oil Company
|
Target
|
May (Month)
|
April-May (Cumulative)
| ||||||
2019-20 (Apr-Mar)
|
2019-20
|
2018-19
|
% over last year
|
2019-20
|
2018-19
|
% over last year
| |||
Target
|
Prod.*
|
Prod.
|
Target
|
Prod.*
|
Prod.
| ||||
CPSE |
145944
|
12344.01
|
11896.24
|
12792.66
|
92.99
|
24010.68
|
23159.56
|
24427.91
|
94.81
|
IOCL |
69900
|
5924.86
|
5926.70
|
6285.17
|
94.30
|
11459.86
|
11461.14
|
11595.05
|
98.85
|
BPCL |
30900
|
2700.00
|
2760.62
|
2680.43
|
102.99
|
5269.99
|
5333.85
|
5191.47
|
102.74
|
HPCL |
16499
|
1556.00
|
1351.27
|
1546.91
|
87.35
|
2963.00
|
2441.14
|
3014.01
|
80.99
|
CPCL |
10400
|
930.00
|
904.24
|
841.22
|
107.49
|
1830.00
|
1744.15
|
1703.48
|
102.39
|
NRL |
2800
|
259.10
|
223.31
|
213.79
|
104.45
|
509.80
|
464.01
|
438.24
|
105.88
|
MRPL |
15400
|
970.00
|
722.30
|
1219.28
|
59.24
|
1970.00
|
1701.29
|
2473.05
|
68.79
|
ONGC |
46
|
4.06
|
7.81
|
5.87
|
133.08
|
8.03
|
14.00
|
12.61
|
111.00
|
JVs |
18755
|
1588.00
|
1787.38
|
1691.43
|
105.67
|
3126.00
|
3509.03
|
3192.08
|
109.93
|
BORL |
7800
|
660.00
|
704.56
|
640.08
|
110.07
|
1300.00
|
1375.62
|
1102.43
|
124.78
|
HMEL |
10955
|
928.00
|
1082.82
|
1051.35
|
102.99
|
1826.00
|
2133.42
|
2089.65
|
102.09
|
Private |
88041
|
7757.00
|
7894.24
|
7757.00
|
101.77
|
14473.94
|
15612.32
|
14473.94
|
107.87
|
RIL |
69145
|
5967.28
|
6137.46
|
5967.28
|
102.85
|
10954.38
|
12143.46
|
10954.38
|
110.85
|
EOL |
18896
|
1789.72
|
1756.77
|
1789.72
|
98.16
|
3519.55
|
3468.86
|
3519.55
|
98.56
|
TOTAL |
252740
|
21689.02
|
21577.85
|
22241.09
|
97.02
|
41610.62
|
42280.91
|
42093.92
|
100.44
|
Figure 3: Monthly Refinery Production
- CPSE Refineries’ production during May, 2019 was 11896.24TMT which is 3.63% lower than the target for the month and 7.01%lowerwhen compared with May, 2018.Cumulative production by CPSE refineries during April-May, 2019 was 23159.56 TMT which is 3.54% lower than the target for the period and5.19% lower than the production during corresponding period of last year. Reasons for shortfall of refinery production in some CPSE refineries are as under:
- HPCL, Mumbai: Lower due to planned shutdown of secondary units.
- HPCL, Visakh: Lower due to crude mix impact.
- CPCL, Manali: Lower due to non receipt of crude vessel at oil jetty BD-3 owing to repair work by Chennai Port.
- NRL, Numaligarh: Lower due to lower crude receipt.
- MRPL, Mangalore: Lower due to restrictionsin supply of water to refinery.
3.2 Production in JV refineries during May, 2019 was 1787.38TMT which is 12.56% higher than the target for the month and5.67% higherwhen compared with May, 2018.Cumulative production by JVs refineries during April-May, 2019 was 3509.03 TMT which is 12.25% higher than the target for the period and9.93%higherthan the production during corresponding period of last year.
3.3 Production in private refineries during May, 2019 was 7894.24TMT which is higherby 1.77% than the target both for the month andcorresponding month of last year. Cumulative production by private refineries during April-May, 2019 was 15612.32 TMT which is higher by 7.87% than the target and corresponding period of last year.
3.4 Refinery-wise details of the capacity utilization and production of petroleum products during the month of May, 2019 and cumulatively for the period April-May, 2019vis-à-vis April-May,2018 are given atAnnexures -IV and V respectively.