AM Green Group is actively focused on achieving Sustainable Development Goals (SDGs), particularly through its green energy initiatives. The company aims to produce green hydrogen, green ammonia, and sustainable aviation fuel, contributing to decarbonization efforts and a low-carbon economy. Their projects, like the 1 MTPA Green Ammonia plant in Kakinada, are designed to support India's net-zero targets and global sustainability goals.
Here's a more detailed look at how AM Green Group aligns with the SDGs:
SDG 7: Affordable and Clean Energy:
AM Green's focus on renewable energy sources (solar, wind, and hydro) for producing green fuels directly addresses this SDG by promoting access to clean and sustainable energy.
SDG 13: Climate Action:
By producing green fuels and chemicals that can replace fossil fuels, AM Green is actively working to combat climate change and its impacts.
SDG 8: Decent Work and Economic Growth:
The company's projects, including the green ammonia plant in Kakinada, are creating jobs and promoting economic growth within the green energy sector.
SDG 9: Industry, Innovation, and Infrastructure:
AM Green is investing in new technologies and infrastructure to produce green fuels and chemicals, supporting innovation and sustainable industrialization.
SDG 12: Responsible Consumption and Production:
AM Green's efforts to promote sustainable consumption and production patterns by using renewable energy and producing green fuels are in line with this SDG.
SDG 17: Partnerships for the Goals:
AM Green is collaborating with partners like DP World to build a sustainable supply chain for green fuels, demonstrating a commitment to international partnerships for achieving the SDGs.
𝐊𝐞𝐲 𝐃𝐨𝐜𝐮𝐦𝐞𝐧𝐭𝐬 𝐏𝐫𝐞𝐩𝐚𝐫𝐞𝐝 𝐛𝐲 𝐐𝐀/𝐐𝐂 𝐄𝐧𝐠𝐢𝐧𝐞𝐞𝐫/𝐈𝐧𝐬𝐩𝐞𝐜𝐭𝐨𝐫𝐬
ReplyDelete1-𝙈𝙚𝙩𝙝𝙤𝙙 𝙎𝙩𝙖𝙩𝙚𝙢𝙚𝙣𝙩 (𝙈𝙊𝙎):
A detailed document describing the methodology, materials, tools, and sequence of activities to execute specific tasks in compliance with project standards.
2-𝙍𝙞𝙨𝙠 𝘼𝙨𝙨𝙚𝙨𝙨𝙢𝙚𝙣𝙩 (𝙍𝘼):
A document identifying potential hazards and risks associated with construction activities, along with proposed mitigation measures to ensure workplace safety.
3-𝙋𝙧𝙤𝙟𝙚𝙘𝙩 𝙌𝙪𝙖𝙡𝙞𝙩𝙮 𝙋𝙡𝙖𝙣 (𝙋𝙌𝙋):
A comprehensive document outlining the quality control measures, procedures, and responsibilities to achieve the required project quality.
4-𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝙖𝙣𝙙 𝙏𝙚𝙨𝙩 𝙋𝙡𝙖𝙣 (𝙄𝙏𝙋):
A document specifying key stages where inspections and testing are carried out to ensure compliance with the approved specifications.
5-𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝘾𝙝𝙚𝙘𝙠𝙡𝙞𝙨𝙩 (𝙄𝘾𝙇):
A checklist used during inspections to verify that all required steps, specifications, and standards are adhered to.
6-𝙈𝙖𝙩𝙚𝙧𝙞𝙖𝙡 𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝙍𝙚𝙦𝙪𝙚𝙨𝙩 (𝙈𝙄𝙍):
A request submitted to inspect and approve materials delivered to the site before their use in construction.
7-𝙒𝙤𝙧𝙠 𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝙍𝙚𝙦𝙪𝙚𝙨𝙩 (𝙒𝙄𝙍) / 𝙍𝙚𝙦𝙪𝙚𝙨𝙩 𝙛𝙤𝙧 𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 (𝙍𝙁𝙄):
A formal request to conduct an inspection of completed work to ensure it meets the design and quality requirements.
8-𝙎𝙞𝙩𝙚 𝙊𝙗𝙨𝙚𝙧𝙫𝙖𝙩𝙞𝙤𝙣 𝙍𝙚𝙥𝙤𝙧𝙩 (𝙎𝙊𝙍):
A document used to log observations made during site visits, including any deviations from approved procedures or standards.
9-𝙉𝙤𝙣-𝘾𝙤𝙣𝙛𝙤𝙧𝙢𝙖𝙣𝙘𝙚 𝙍𝙚𝙥𝙤𝙧𝙩 (𝙉𝘾𝙍):
A formal report documenting instances where work, materials, or processes fail to meet specified standards, requiring corrective actions.
10-𝘾𝙤𝙧𝙧𝙚𝙘𝙩𝙞𝙫𝙚 𝘼𝙘𝙩𝙞𝙤𝙣 𝙍𝙚𝙥𝙤𝙧𝙩 (𝘾𝘼𝙍):
A follow-up report detailing the actions taken to resolve non-conformances identified during inspections.
11-𝙊𝙥𝙚𝙧𝙖𝙩𝙞𝙤𝙣 & 𝙈𝙖𝙞𝙣𝙩𝙚𝙣𝙖𝙣𝙘𝙚 𝙈𝙖𝙣𝙪𝙖𝙡𝙨 (𝙊&𝙈):
Comprehensive documentation that includes detailed operating procedures, maintenance schedules, and troubleshooting guides for all systems and equipment handed over to the client.
12-𝙁𝙞𝙣𝙖𝙡 𝙃𝙖𝙣𝙙𝙤𝙫𝙚𝙧 𝘿𝙤𝙘𝙪𝙢𝙚𝙣𝙩𝙨:
A package of key documents provided to the client at the conclusion of the project, typically including as-built drawings, test certificates, warranties, O&M manuals, and other necessary documentation.