1,639,265 Street Lights Replaced with Led Bulbs
1,639,265
street bulbs have been replaced with LED Lights throughout the country under Street
Lighting National Programme (SLNP). This was stated by Shri Piyush Goyal,
Minister of State (IC) for Power, Coal, New & Renewable Energy and Mines in
a written reply to a question in Rajya Sabha today.
The
details are as follows:
State/UT-wise details regarding
number of street lights replaced by LED lamps
under SLNP Programme:
State/UT
|
No. of LED street lights
|
Andhra Pradesh
|
575,625
|
Bihar
|
150
|
Delhi
|
226,718
|
Himachal Pradesh
|
12,681
|
Kerala
|
9,707
|
Maharashtra
|
24,154
|
Puducherry
|
300
|
Rajasthan
|
593,523
|
Telangana
|
2,671
|
Tripura
|
36,789
|
Uttar Pradesh
|
41,646
|
Assam
|
4,798
|
Gujarat
|
44,147
|
Jharkhand
|
2,800
|
Madhya Pradesh
|
9,407
|
Punjab
|
3,682
|
West Bengal
|
300
|
Jammu & Kashmir
|
700
|
Uttarakhand
|
500
|
Goa
|
48,306
|
Chhattisgarh
|
661
|
Total
|
1,639,265
|
ABOUT SLNP
Prime
Minister Shri Naremdra Modi, has launched the Street Lighting National
Programme (SLNP) on 5th January, 2015 to attain significant savings by
promoting LED based lighting. The scheme is being implemented by Energy
Efficiency Services Limited (EESL), a joint venture company of four Public
Sector Undertakings under the Ministry of Power. There is no element of
Government of India subsidy in the scheme. EESL has evolved a service model to
enable municipalities to replace conventional lights with LEDs at no upfront
cost. The resultant reduction in Energy and maintenance cost of the
municipality is used to repay EESL over a period of time. The target is to
install 3.5 crore LED street.
lights in all the Urban Local Bodies (ULBs) of the country by
March, 2019, which will result in avoided capacity generation of 1500 MW and
save 9 billion KWh per year. The benefits likely to be accrued to the country as a result
of implementation of SLNP programme is as follows:
No of LED bulbs
distributed/street lights to be replaced in 3 years
|
3.5 crore
|
Expected annual energy savings
|
9 billion KWh (Approx)
|
Expected reduction in installed load
|
1500 MW (Approx)
|
Estimated capital investment (excluding O&M cost) (Approx)
|
Rs. 35,000 crore
|
Annual estimated GHG emission reductions (Approx)
|
6.2 million tonnes of CO2
|
Estimated
quantum of energy saved so far as a result of implementation (billion KWh per
year)
|
0.42
|
RM/PS