Taking Control
Figure 1
Determining whether management is properly addressing risk
by J.P. RussellOrganizations need controls to ensure objectives are achieved. It’s management’s job to establish, implement and monitor controls, and the auditor’s job to determine whether they are adequate.
In some cases, organizations adopt standards that require controls. Many performance standards—such as ISO 9001:2008—call for control of an activity, process, function, department or system. The word control is used 29 times in ISO 9001:20081 and about 45 additional times in the auto industry’s ISO/TS 16949.2 In fact, the word is used frequently in most standards.
Some people think of a standard as a set of controls to address a particular need, such as to ensure a quality product or service is provided, or that environmental risks are minimized. When auditing against standards that require control, it is imperative for auditors to be able to determine whether control is adequate.
Organizations, therefore, need to be able to demonstrate to auditors that they have implemented adequate controls relative to the importance or risk of the activity.
Wordplay
The word control can be used in titles such as "control of production" or "control of measuring devices." It also can be used to describe a document, such as a "control plan."When control is used as a verb, there must be some type of action that achieves a goal or objective. For example, "The organization shall control the distribution of customer intellectual property."
When control is used as a noun, it implies all necessary means should be used to ensure objectives are achieved. For example, "Organizations must implement controls or management must ensure the control of product labeling."
When control is an adjective, it describes a noun such as a control chart or control plan. This indicates the plan contains parameters for a process, product or service.
Regardless of how the word is used, it’s meaningless if that’s all it is—just a word. For example, the Code of Federal Regulations Title 21 says, "Each manufacturer shall establish and maintain procedures to control labeling activities."3 But just because an organization has established a labeling control procedure doesn’t mean it has met the requirement to control labeling.
A procedure is one tool a manager has to ensure processes are controlled. In some cases, however, procedures are worthless except to meet a requirement. During an audit I conducted, I asked a truck driver how he loaded the truck. He responded, "Do you want me to tell you what’s in the procedure or what we actually do?"
Management uses many tools to ensure
operations are controlled. Control tools can include procedures, checklists,
schedules, reviews, policies, budgets, instructions, forecasts, pro forma
statements, reports, flowcharts, video surveillance, statistical techniques,
training, records, software, devices and internal auditing.With
such a host of tools available, how does management decide which combination of
tools is needed? How much is enough? When is it too much? For example, do you
need a security officer outside the break room logging
people in and out?
Control concept
For organizations such as the Institute of Internal Auditors, internal control is a business concept. Businesses need internal control to achieve profitability, meet performance targets and prevent loss of resources. Internal controls are needed to provide reasonable assurance that objectives will be achieved.While all of that makes sense, I’m not sure that—even as an auditor—I’m any closer to answering a few fundamental questions:
- What is control?
- How do I know it exists?
- How do I determine whether controls are adequate?
Some standards have prescriptive "to-do" requirements that must be included in the control of an activity or process. When the control is audited, auditors can check off that certain prescriptive requirements are in place.
For example, for incoming orders that must be controlled:
- There must be a procedure that ensures orders are controlled.
- Orders must be recorded.
- Orders must be reviewed prior to acceptance.
- Order changes must be communicated to all interested parties.
When a standard has a prescribed list of requirements, auditors can check off the areas in which the organization has addressed each requirement. The implication is that if the organization addressed each specified requirement—as with incoming orders—the process is controlled. Adequate control is then linked to the prescribed list of requirements.
Control process
We assume the prescribed list provided by the standard writers is commiserate with the risk and anticipates all situations. But this may be faulty thinking.What if the requirement is open-ended? For example, it may say that management must control the work environment and ensure it is safe. What if there is no specified requirement list? What if the standard’s requirement is that incoming orders must be controlled to ensure customer requirements are met?
It is a reasonable requirement to control incoming orders. But the auditor charged with the responsibility to verify compliance doesn’t have a prescriptive list to follow and must ask him or herself a few questions to get to the bottom of the situation:
- What is the basis for noncompliance?
- What evidence would withstand the scrutiny of the exit meeting and a subsequent review if a nonconformity is appealed or questioned?
- When requirements are open-ended, must the auditor be willing to accept any rational scenario, or can the organization be challenged?
The process technique uses the plan-do-check-act (PDCA) cycle:
- Plan. A plan, procedure or method is developed (establish what needs to be done).
- Do. The plan, procedure or method is being followed (do what was planned).
- Check. The plan, procedure or method is monitored or measured against a criterion (know when it is done right or wrong).
- Act. Action is taken to resolve the differences between expected and planned results (for example, analyze and adjust to the process or activity).
Next, management must determine the criteria or objectives for success or acceptance. If any output of the predetermined method is acceptable, the process does not need to be controlled.
Lastly, management must act on the results of comparing outputs to objectives. If management does not act on the results, either the process does not need to be controlled or management is incompetent. See Figure 1 for examples of evidence you may need to verify that controls are adequate.
At the basic level, an organization must address the four process technique requirements contained in the PDCA approach for there to be adequate control. With those techniques in mind, we may want to define management control as: "When predetermined plans are followed, monitored against acceptance criteria and adjusted as needed to achieve objectives."
Control levels
Not all controls are the same. The extent or levels of control must be relative to their risk to the organization. Every organization faces a variety of risks to its survival. The higher the risk, the more formal or complex the controls should be. The controls for a nuclear power plant are different than for a hotel. Organizations should assess the consequences of failure and establish controls relative to those consequences.Management identifies processes that need to be controlled either from self-determination or based on what is required by law. For control to be adequate, it must be at the appropriate level relative to the organization’s type, size, complexity, risk and competency of employees.
From the highest level, the board of directors and CEO may determine there needs to be control of financial reporting, effectiveness of operations, and compliance to laws and regulations.
Auditors have at least two approaches that can be used to ensure controls are adequate: the PDCA for auditing technique and the requirement techniques referenced in the standard—for example, in ISO 9001:2008, subclause 7.5.1, control of production and service provision.
The requirement technique has a handy list of specific things to consider for controlling an operation or process. Based on that, an auditor can compile a checklist.
Ask yourself
For there to be management control, there must be a predetermined method. This method should be followed and monitored, and there should be a means to adjust the process.Universal interview questions auditors should ask are:
- How do you know what to do?
- Can you show or tell me how you do it?
- How do you know when it is done right?
- What do you do when it’s not done right?
References
- International Organization for Standardization, ISO 9001:2008—Quality management systems—Requirements.
- International Organization for Standardization, ISO/TS 16949:2008—Quality management systems—Particular requirements for the application of ISO 9001:2008 for automotive production and relevant service part organizations.
- Food and Drug Administration, "Code of Federal Regulations Title 21," subpart K, section 820.120, 2010.