Shri SKB Valli sir site incharge sir focusing all activities to monitor to excel quality control snd quality assurance.
For the Greenko Pinnapuram Integrated Renewable Energy Project (IREP), Waaree's EPC role involved end-to-end quality management, using advanced SCADA for real-time monitoring, third-party inspections, multistage design reviews, site-specific training, digitalized QMD, and stringent component testing (like bifacial modules) to ensure high efficiency, reliability, and compliance with environmental norms, focusing on minimizing shading with optimized layouts and robust evacuation systems.
Greenko's Overall Quality Approach for Pinnapuram
Multi-stage Reviews: Rigorous checks on engineering & designs from concept to completion.
Digitalized QMD: Online Quality Management Documentation for transparency and quick access.
Advanced Labs: Setting up testing labs at project sites for immediate analysis.
Third-Party Audits: Engaging external agencies for independent material inspection.
Specialized Training: Collaborating with premium institutes for tailor-made training.
Innovative Testing: Using advanced methods for critical components and activities.
Waaree's EPC & Quality Focus
Turnkey EPC: Full responsibility for Engineering, Procurement, and Construction.
High-Efficiency Modules: Using 545Wp bifacial monocrystalline modules for better energy yield.
Optimized Design: Fixed-tilt MMS system with 5° angle and strategic pitch to reduce inter-row shading.
Advanced SCADA: Real-time monitoring, remote diagnostics, and centralized control for maximized uptime.
Evacuation & Infrastructure: Handling electrical, structural, civil works, and power evacuation systems.
Compliance: Supporting clients with grid compliance and regulatory approvals.
Key Quality Control Aspects (Waaree/Greenko)
Material Quality: Ensuring PV modules, inverters, structures, cables, and transformers meet standards through inspections.
Installation Quality: Visual checks, field testing, and documentation for correct setup.
Environmental Compliance: Monitoring noise, air, and water quality as per CPCB guidelines.
Risk Management: Proactive measures to control costs and assure quality, as per KPI Green Energy.
In essence, Waaree delivered the complex Pinnapuram project using robust quality systems integrated with Greenko's extensive experience, ensuring high performance and compliance through advanced technology and rigorous processes.