FORM 1
(I)
Basic
Information
Sl.No.
|
Item
|
Details
|
|
Name of the project/s
|
|
|
S.No. in the schedule
|
|
|
Proposed capacity /area/length/tonnage to be handled/command
area/lease area/number of wells to be drilled.
|
|
|
New/Expansion/Modernization
|
|
|
Existing Capacity/Area
etc.
|
|
|
Category of
Project i.e. ‘A’ or ‘B’
|
|
|
Does it
attract the general condition? If yes, please specify.
|
|
|
Does it
attract the specific condition? If yes, please specify.
|
|
|
Location
Plot/Survey/Khasra
No.
Village
Tehsil
District
State
|
|
|
Nearest
railway station/airport along with distance in kms.
|
|
|
Nearest Town,
city, district Headquarters along with distance in kms.
|
|
|
Village Panchayats, Zilla Parishad, Municipal Corporation, Local body
(complete postal addresses with telephone nos. to be given)
|
|
|
Name of the
applicant
|
|
|
Registered
Address
|
|
|
Address
for correspondence:
Name
Designation
(Owner/Partner /CEO)
Pin code
E-mail
Telephone
No.
Fax No.
|
|
|
Details of
Alternative Sites examined, if any. Location of these sites should be shown
on a topo sheet.
|
Village-District-State
1
2
3
|
|
Interlinked
Projects
|
|
|
Whether
separate application of interlinked project has been submitted?
|
|
|
If yes, date
of submission
|
|
|
If no, reason
|
|
|
Whether the proposal involves approval/clearance under: if yes, details
of the same and their status to be given.
i.
The Forest (Conservation) Act, 1980?
ii.
The
Wildlife (Protection) Act, 1972?
iii.
The
C.R.Z. Notification, 1991?
|
|
22.
|
Whether there is any Government Order/Policy relevant /relating to
the site?
|
|
23.
|
Forest
land involved (hectares)
|
|
24.
|
Whether there is any litigation pending against the project and/or
land in which the project is propose to be set up?
a)
Name of
the Court
b)
Case No.
c)
Orders/directions
of the Court, if any and its relevance with the proposed project.
|
|
(II)
Activity
1. Construction,
operation or decommissioning of the Project involving actions, which will cause
physical changes in the locality (topography, land use, changes in water
bodies, etc.)
S.No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities /rates, wherever
possible) with source of information data
|
||
1.1
|
Permanent or temporary
change in land use, land cover or topography including increase in intensity of land use (with respect to
local land use plan)
|
|
|
||
1.2
|
Clearance of existing
land, vegetation and buildings?
|
|
|
||
1.3
|
Creation
of new land uses?
|
|
|
||
1.4
|
Pre-construction
investigations e.g. bore houses, soil testing?
|
|
|
||
1.5
|
Construction
works?
|
|
|
||
1.6
|
Demolition
works?
|
|
|
||
1.7
|
Temporary sites used
for construction works or
housing of construction workers?
|
|
|
||
1.8
|
Above ground buildings,
structures or
earthworks including linear structures,
cut and
fill or excavations
|
|
|
||
1.9
|
Underground works
including mining or tunneling?
|
|
|
||
1.10
|
Reclamation works?
|
|
|
||
1.11
|
Dredging?
|
|
|
||
1.12
|
Offshore structures?
|
|
|
||
1.13
|
Production and
manufacturing processes?
|
|
|
1.14
|
Facilities for storage
of goods or materials?
|
|
|
1.15
|
Facilities for
treatment or disposal of solid waste or liquid effluents?
|
|
|
1.16
|
Facilities for long
term housing of operational
workers?
|
|
|
1.17
|
New road, rail or sea traffic during
construction or operation?
|
|
|
1.18
|
New road, rail, air waterborne or other
transport infrastructure including new or altered routes and stations, ports,
airports etc?
|
|
|
1.19
|
Closure or diversion of existing transport
routes or infrastructure leading to changes in traffic movements?
|
|
|
1.20
|
New or diverted transmission lines or pipelines?
|
|
|
1.21
|
Impoundment, damming,
culverting, realignment or other changes to the hydrology of watercourses or aquifers?
|
|
|
1.22
|
Stream crossings?
|
|
|
1.23
|
Abstraction or
transfers of water form ground or surface waters?
|
|
|
1.24
|
Changes in water bodies
or the land surface affecting drainage or run-off?
|
|
|
1.25
|
Transport of personnel
or materials for construction, operation or decommissioning?
|
|
|
1.26
|
Long-term dismantling
or decommissioning or restoration works?
|
|
|
1.27
|
Ongoing activity during
decommissioning which could have an impact on the environment?
|
|
|
1.28
|
Influx of people to an
area in either temporarily or permanently?
|
|
|
1.29
|
Introduction of alien
species?
|
|
|
1.30
|
Loss of native species
or genetic diversity?
|
|
|
1.31
|
Any other actions?
|
|
|
2. Use
of Natural resources for construction or operation of the Project (such as
land, water, materials or energy, especially any resources which are
non-renewable or in short supply):
S.No.
|
Information/checklist
confirmation
|
Yes/No
|
Details thereof (with
approximate quantities /rates, wherever possible) with source of information
data
|
2.1
|
Land
especially undeveloped or agricultural land (ha)
|
|
|
2.2
|
Water (expected source & competing
users) unit: KLD
|
|
|
2.3
|
Minerals
(MT)
|
|
|
2.4
|
Construction material – stone, aggregates,
sand / soil (expected source – MT)
|
|
|
2.5
|
Forests
and timber (source – MT)
|
|
|
2.6
|
Energy
including electricity and fuels (source, competing users) Unit: fuel (MT),
energy (MW)
|
|
|
2.7
|
Any
other natural resources (use appropriate standard units)
|
|
|
3. Use,
storage, transport, handling or production of substances or materials, which could be harmful to
human health or the environment or raise concerns about actual or perceived risks to human health.
S.No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities/rates, wherever
possible) with source of information data
|
3.1
|
Use of substances or
materials, which are hazardous (as per MSIHC rules) to human health or the
environment (flora, fauna, and
water supplies)
|
|
|
3.2
|
Changes in occurrence
of disease or affect disease vectors (e.g. insect or water borne diseases)
|
|
|
3.3
|
Affect the welfare of
people e.g. by changing living conditions?
|
|
|
3.4
|
Vulnerable groups of
people who could be affected by the project e.g. hospital patients, children,
the elderly etc.,
|
|
|
3.5
|
Any other causes
|
|
|
4. Production of solid wastes during
construction or operation or
decommissioning (MT/month)
S.No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities/rates, wherever
possible) with source of information data
|
4.1
|
Spoil, overburden or
mine wastes
|
|
|
4.2
|
Municipal waste
(domestic and or commercial
wastes)
|
|
|
4.3
|
Hazardous
wastes (as per Hazardous Waste
Management Rules)
|
|
|
4.4
|
Other industrial process wastes
|
|
|
4.5
|
Surplus
product
|
|
|
4.6
|
Sewage
sludge or other sludge from effluent
treatment
|
|
|
4.7
|
Construction
or demolition wastes
|
|
|
4.8
|
Redundant
machinery or equipment
|
|
|
4.9
|
Contaminated soils or other materials
|
|
|
4.10
|
Agricultural
wastes
|
|
|
4.11
|
Other solid wastes
|
|
|
5. Release of
pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)
S.No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities/rates, wherever
possible) with source of information data
|
5.1
|
Emissions
from combustion of fossil fuels from stationary or mobile sources
|
|
|
5.2
|
Emissions
from production processes
|
|
|
5.3
|
Emissions
from materials handling including
storage or transport
|
|
|
5.4
|
Emissions from
construction activities including plant and equipment
|
|
|
5.5
|
Dust or odours from
handling of materials including construction materials, sewage and waste
|
|
|
5.6
|
Emissions from incineration of waste
|
|
|
5.7
|
Emissions from burning
of waste in open air (e.g. slash materials, construction debris)
|
|
|
5.8
|
Emissions from any
other sources
|
|
|
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities/rates, wherever possible)
with source of information data with source of information data
|
6.1
|
From operation of equipment e.g. engines,
ventilation plant, crushers
|
|
|
6.2
|
From industrial or similar processes
|
|
|
6.3
|
From construction or demolition
|
|
|
6.4
|
From blasting or piling
|
|
|
6.5
|
From construction or operational traffic
|
|
|
6.6
|
From
lighting or cooling systems
|
|
|
6.7
|
From any other sources
|
|
|
7. Risks
of contamination of land or water from releases of pollutants into the ground or into sewers,
surface waters, groundwater, coastal waters or the sea:
S.No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities/rates, wherever
possible) with source of information data
|
7.1
|
From handling, storage, use or spillage of hazardous
materials
|
|
|
7.2
|
From discharge of sewage or other effluents
to water or the land (expected mode and place of
discharge)
|
|
|
7.3
|
By deposition of pollutants emitted to air
into the land or into water
|
|
|
7.4
|
From any other sources
|
|
|
7.5
|
Is there a risk of long term build up of
pollutants in the environment from these
sources?
|
|
|
8. Risk
of accidents during construction or operation of the Project, which could
affect human health or the environment
S.No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities/rates, wherever
possible) with source of information data
|
8.1
|
From explosions,
spillages, fires etc from storage, handling, use or production of hazardous
substances
|
|
|
8.2
|
From any other causes
|
|
|
8.3
|
Could
the project be affected by natural disasters causing environmental damage
(e.g. floods, earthquakes,
landslides, cloudburst etc)?
|
|
|
9. Factors which
should be considered (such as consequential development) which could lead to
environmental effects or the potential for cumulative impacts with
other existing or planned activities in the locality
S. No.
|
Information/Checklist confirmation
|
Yes/No
|
Details thereof (with approximate quantities/rates, wherever
possible) with source of information data
|
9.1
|
Lead to development of supporting.
lities, ancillary development or development
stimulated by the
project which could have impact on the environment e.g.:
• Supporting
infrastructure (roads, power supply, waste or waste water treatment, etc.)
• housing development
• extractive industries
• supply industries
• other
|
|
|
9.2
|
Lead to after-use of
the site, which could havean impact on the environment
|
|
|
9.3
|
Set a precedent for
later developments
|
|
|
9.4
|
Have cumulative effects
due to proximity to other existing or planned projects with similar effects
|
|
|
(III)
Environmental
Sensitivity
S.No.
|
Areas
|
Name/
Identity
|
Aerial distance (within 15 km.)
Proposed project location boundary
|
1
|
Areas protected under international
conventions, national or local
legislation for their ecological,
landscape, cultural or other related value
|
|
|
2
|
Areas which are
important or sensitive for ecological reasons - Wetlands, watercourses or
other water bodies, coastal zone, biospheres, mountains, forests
|
|
|
3
|
Areas used by
protected, important or sensitive
species of flora or fauna for breeding, nesting, foraging, resting,
over wintering, migration
|
|
|
4
|
Inland, coastal, marine or underground
waters
|
|
|
5
|
State, National boundaries
|
|
|
6
|
Routes or facilities used by the public for
access
to recreation or other tourist, pilgrim
areas
|
|
|
7
|
Defence installations
|
|
|
8
|
Densely populated or built-up area
|
|
|
9
|
Areas occupied by sensitive man-made land
uses (hospitals, schools, places of worship, community facilities)
|
|
|
10
|
Areas containing
important, high quality or scarce resources
(ground
water resources, surface resources, forestry, agriculture, fisheries,
tourism, minerals)
|
|
|
11
|
Areas already subjected to pollution or environmental damage. (those where existing legal environmental
standards are exceeded)
|
|
|
12
|
Areas susceptible to natural hazard which
could cause the project to present
environmental problems
(earthquakes,
subsidence, landslides, erosion, flooding or extreme or adverse climatic
conditions)
|
|
|
(IV).Proposed Terms of Reference for EIA studies:
“I hereby given undertaking that
the data and information given in the application and enclosures are true to
the best of my knowledge and belief and I am aware that if any part of the data
and information submitted is found to be false or misleading at any stage, the
project will be rejected and clearance give, if any to the project will be
revoked at our risk and cost.
Date: _______________
Place:
______________
Signature of the applicant with
Name and Full Address
(Project Proponent /Authorised
Signatory)
Note:
1.
The projects involving clearance under Coastal Regulation
Zone Notification, 1991 shall submit with the application a C.R.Z map duly
demarcated by one of the authorized agencies, showing the project activities,
w.r.t. C.R.Z (at the stage of TOR) and the recommendations of the State Coastal
Zone Management Authority (at the state of EC). Simultaneous action shall also
be taken to obtain the requisite clearance under the provisions of the C.R.Z
Notification, 1991 for the activities to be located in the CRZ.
2.
The projects to be located within 10 km of the National
Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals,
the project proponent shall submit the map duly authenticated by Chief Wildlife
Warden showing these features vis-Ã -vis the project location and the
recommendations or comments of the Chief Wildlife Warden thereon (at the state
of EC).”
3.
All correspondence with the Ministry of Environment
& Forests including submission of application for TOS/Environmental
Clearance, subsequent clarifications, as may be required from time to time,
participation the EAC Meeting on behalf of the project proponent shall be made
by the authorized signatory only. The authorized signatory should also submit a
document in support of his claim of being an authorized signatory for the
specific project.”