Lr.No.44119/PCB/JA/TS/2004, Date :___
To
Sir,
Sub:-
|
Issue of Air Consent
forms for obtaining consent for operation – Reg.
|
Ref:-
|
Your
Lr.No ___
dt. _______
|
While acknowledging the
receipt of the Demand Draft for Rs. 50/- through your letter cited, I enclose a
set of Consent forms in quadruplicate. You are informed that, as per Section 21
of the Air(Prevention and Control of
Pollution) Act, 1981 as amended, it is obligatory on the part of the
person seeking Consent of the Board under Section 21 of the Air(Prevention &
Control of Pollution) Act, 1981 to
ensure that his application for grant of Consent for Operation should accompany
with fees at the rates shown overleaf as per the A.P Gazette Notification
Part-1, dt:18.12.1997.
You are requested to submit
the application in triplicate duly filled in along with Consent fee as per the
rates mentioned in the above Gazette Notification at concerned Regional Office
of A.P. Pollution Control Board for further necessary action. The criteria for
fixing the Consent fee is the total investment of the industry. The total
investment should be reckoned as the entire investment including the cost of
Land and Building on the industry, but excluding the working capital. The
depreciation on industry should not be taken in to consideration, in the case
of already established industries. In case the industry had expanded / proposed
to go in for expansion, the cost of expansion should also be taken into
consideration.
The prescribed Consent fee
is be paid by crossed Demand Draft drawn on any Scheduled bank in favour of
A.P. Pollution Control Bard payable at respective Head Quarters of concerned
Regional Office.
You can apply for the
maximum revised validity periods as per the following table:
SI.
No.
|
Item
|
Maximum Validity Period
|
1
|
CFO issuance for first time after obtaining CFE
irrespective of category of unit
|
1 year
|
2
|
Red Category units
|
2 years
|
3
|
Orange Category units
|
3 years
|
4
|
Green Category units
|
5 years
|
5
|
Units with ISO 14000 certificate irrespective of
category (not for fresh cases)
|
1 year over and above the above period (SI.Nos. 2&3)
|
6
|
Cleaner Production Technology
|
3 years (Red Category only)
|
Note: To avail the maximum
validity period, you are required to pay the Consent fee for the entire period
along with the application.
If
the application is made for the renewal, you are requested to send a condition
wise compliance report on the conditions stipulated in the earlier Consent
order issued by the Board.
Yours faithfully,
For Member Secretary.
Encl: Consent form
(in Quadruplicate)
A.P.Gazettee Notifiaction Part-1, date:
18.12.1997
Investment Rs.
In crores.
|
Red Category |
Orange
Category
|
Green
Category
|
|||||||
Industries
generating Hazardous waste as per HWM & H Rules, 1989
|
Non-Hazardous Industries |
Industries
generating Hazardous waste as per HWM & H Rules, 1989
|
Non-Hazardous
Industries
|
Industries
generating Hazardous waste
as per HWM & H Rules, 1989 |
||||||
Rate of fee
on investment (%)
(Rounding
off to nearest Rs.100/-)
|
With
Minimum amount of Rs.
|
Rate of fee
on investment (%) (Rounding off to
nearest Rs.100/-)
|
With
Minimum amount of Rs.
|
Rate of fee
on investment (%) (Rounding off to nearest Rs.100/-)
|
With
Minimum amount of Rs.
|
Rate of fee
on investment (%) (Rounding off to nearest Rs.100/-)
|
With
Minimum amount of Rs.
|
Rate of fee
on investment (%) (Rounding off to nearest Rs.100/-)
|
With
Minimum
amount of Rs. |
|
0 to 0.025
|
0.2000000
|
0.00
|
0.0150000
|
0.00
|
0.1000000
|
0.00
|
0.750000
|
0.00
|
0.500000
|
0.00
|
Above 0.025 to 0.25
|
0.0400000
|
500.00
|
0.0300000
|
400.00
|
0.0200000
|
300.00
|
0.0150000
|
200.00
|
0.0100000
|
100.00
|
Above 0.25 to 0.50
|
0.0250000
|
1000.00
|
0.0187500
|
800.00
|
0.0125000
|
500.00
|
0.0093500
|
400.00
|
0.0062500
|
300.00
|
Above 0.50 to 1.00
|
0.0250000
|
1300.00
|
0.0187500
|
1000.00
|
0.0125000
|
700.00
|
0.0093500
|
500.00
|
0.0062500
|
400.00
|
Above 1.00 to 3.00
|
0.0250000
|
2500.00
|
0.0187500
|
1900.00
|
0.0150000
|
1300.00
|
0.0093500
|
1000.00
|
0.0062500
|
700.00
|
Above 3.00 to 5.00
|
0.0300000
|
7500.00
|
0.0225000
|
5700.00
|
0.0150000
|
3800.00
|
0.0112500
|
2800.00
|
0.0075000
|
1900.00
|
Above 5.00 to 10.00
|
0.0300000
|
15000.00
|
0.0225000
|
11300.00
|
0.0150000
|
7500.00
|
0.0112500
|
5700.00
|
0.0075000
|
3800.00
|
Above 10.00 to 25.00
|
0.0150000
|
30000.00
|
0.0112500
|
22500.00
|
0.0075000
|
15000.00
|
0.0056000
|
11300.00
|
0.0037500
|
7500.00
|
Above 25.00 to 50.00
|
0.0100000
|
37500.00
|
0.0007500
|
28200.00
|
0.0050000
|
18800.00
|
0.0037500
|
14000.00
|
0.0025000
|
9400.00
|
Above 50.00 to 100.00
|
0.0750000
|
50000.00
|
0.0062500
|
37500.00
|
0.0037500
|
25000.00
|
0.0028000
|
18800.00
|
0.0018750
|
12500.00
|
Above 100.00 to 500.00
|
0.0030000
|
75000.00
|
0.0022500
|
62500.00
|
0.0015000
|
37500.00
|
0.0011000
|
28000.00
|
0.0007500
|
18800.00
|
Above 500.00 to 1000.00
|
0.0025000
|
150000.00
|
0.0187580
|
112500.00
|
0.0012500
|
75000.00
|
0.0009350
|
55000.00
|
0.0006250
|
37500.00
|
Above 1000.00 to 5000.00
|
0.0070000
|
250000.00
|
0.0005250
|
187500.00
|
0.0003500
|
125000.00
|
0.0002625
|
93500.00
|
0.0001750
|
62500.00
|
Above 5000.00 to 10000.00
|
0.0005000
|
350000.00
|
0.0003750
|
262500.00
|
0.0002500
|
175000.00
|
0.0001875
|
131300.00
|
0.0001250
|
87500.00
|
Above 10000.00 to 20000.00
|
0.0005000
|
500000.00
|
0.0003750
|
325000.00
|
0.0002500
|
250000.00
|
0.0001875
|
187500.00
|
0.0001250
|
125000.00
|
Above 20000.00
|
0.0050000
|
1000000.00
|
0.0003750
|
750000.00
|
0.0002500
|
500000.00
|
0.0001875
|
375000.00
|
0.0012500
|
250000.00
|
Note:
Consent for Operation / Renewal fee has to be paid annually, under Water
Act,1974 and Air Act,1981 separately with the above rates, if the industry is
having both Air & Water pollution. If any industry is having water pollution
only, they have to pay only one fee with the above rates. Similarly if any
industry is having only Air pollution they have to pay only one fee with above
rates. The Hazardous Waste generating industries have to pay Consent for
Operation / renewal fee under Water Act
and Air Act separately and they need not pay any separate fees for the
authorizations to be issued under the Hazardous Waste (Management &
Handling) Rules, 1989.
ORIGINAL
PRICE
RS.50/-
For
Member Secretary
FORM-1
APPLICATION FOR CONSENT FOR
EMISSION UNDER SECTION (21) OF THE ACT
(SEE CHAPTER-11)
To be submitted in Triplicate
Application for Consent
emissions in (1)__________________________________
Area which is the “Air Pollution
Control Area” notified under Section ________________________
Of the Act under Government
Gazette Notification No. __________________________________
Industry specified
schedule________________________________________________________
(i)
|
(a) Area
Code No.______________________________
|
dated___________________
|
|
(b) Grid
Code No.______________________________
|
Dated___________________
|
From: _________________________________
__________________________________
__________________________________
To
THE MEMBER SECRETARY
A.P.
Pollution Control Board,
Paryavarana Bhavan,
A3, IE, Sanathnagar, Hyderabad.
Sir,
I/We
apply for CONSENT under Section(21) of the Air(Prevention and Control of
Pollution) Act, 1981( 14 of 1981) to make emission from industrial plant owned
by (1) or occupied by
(2)_____________________________________________________________________________________________________________________________________________________for
a
Period upto_____ .
(3)
I/We further declare that the information furnished
in the Annexure/Appendices and Plans is correct to the best of my/our
knowledge.
(4)
I/We
herby submit that in case of change either of the point, or the quantity of
emission or its quality a fresh application for CONSENT shall be made and until
such consent is granted, no change shall be made.
(5)
I/We
hereby agree to submit to the Board, an application for renewal of CONSENT one
month in advance of the date of expiry of the consented period for emission, if
to be continued thereafter.
(6)
I/We
undertake to furnish any other information with in one month of its being
called by the Board.
(7)
I/We
enclosed a demand draft of Rs._ __ towards
the prescribed consent application fee.
(8)
The
Annexure, appendices, other particulars and plans are attached herewith in
triplicate.
Accompaniments :
Accompaniments :
i)
|
Index/Site
plan
|
|
ii)
|
Topographical
map
|
|
iii)
|
Detailed
layout plan of different processes and point sources of Emission and position
of stacks
and
Chimneys
|
|
iv)
|
Process
flow Sheet
|
|
v)
|
Latest
Analysis Report
|
|
vi)
|
Details
of Air Pollution Control devices provided or proposed to be provided.
|
|
vii)
|
Ambient
Air Quality Report if available.
|
|
viii)
|
Draft
No.___________________________________________Dated_________
For
Rs.___________________________________________Drawn on_______
________________________________________________as
consent fee.
|
Signature
|
|
Name of
the applicant
|
|
Address
of Applicant
|
|
ANNEXURE TO FORM 1
CHIMNEY
Existing
:
New :
Altered :
Note: Any Applicant knowingly giving incorrect
information or suppressing any information thereto
shall be liable for action under the provisions of the Act.
While filling this Annexure the applicant shall for such of the items
not pertaining to his
activity
shall state not applicable against the relevant item and shall not leave it
blank.
1.
|
(a) Full name of the applicant with address
|
|
|
|
|
(b) Name and Telephone No. of persons incharge of
the premises
|
|
|
|
|
|
2.
|
(a) Full
name of the industrial plant with
address
|
|
|
|
|
|
(b) Full name and address of the occupier
(defined in the Act ) as Registered with the Director of Factories &
Boilers of the State or with any other competent authority of the state.
|
Tel. No.
|
3.
|
(a) Give Revenue / City Survey No. of the Land ?
Premises for which the application is made.
|
District Taluk
Town
Village
City Survey No Area in
Hectares
|
|
(b) Magisterial Jurisdiction of the industry
(premises) for purposes of prosecution case under the Act and also the name
& address of the Police station under the industry (Premises) falls for
all criminal cases connected with the Water Act, 1974 or Air Act, 1981.
|
|
4.
|
State month and year in which the industrial
plant was actually put into commission or is proposed to be put into
commission/or the month and year from which the local body is functioning
|
|
5.
|
(a) State the civil/Military Defence/
Industrial Estate
etc., under.
Whose administrative
jurisdiction the occupiers
industrial plant
is situated.
|
Collectorate :
Corporation:
Municipality:
Village
Panchayat:
Cantonment:
Defence
Department:
Port Trust:
State Government:
Prohibited Area:
Central
Government:
Airport Authority
or specify any other:
|
|
(b) Attach map showing topographical features of the area.
|
|
6.
|
Elevation above mean sea
|
|
7.
|
Present use. of the Land
|
Agricultural
Forest
Grazing
Settlement
Fallow |
8.
|
Indicate the
nature of topography Plains
Surrounding the site.
|
Plains
Valley
Hilly
River Basin
Coastal
Estuarine
Land-Locked
|
9.
|
(a) State whether
the industrial plant has been declared as prohibited area.
|
Yes/No
|
(b) If Yes,
State the name of the authority and furnish a certified copy of the order
which the area has been declared as prohibited.
|
|
|
10.
|
What of the
following features exist
within 20 Kms of
the site
|
Human settlement: specify
(Population and distance
from the Plant)
Agriculture : specify crops
Grazing land /
Fisheries
Forest/Sanctuary/National Park/
Nallahs/Streams/Rivers/
Ponds/Lakes/Dams/Estuary/
Sea/Hills/Mountains/industries
Specify ancient Monuments/Tourism area,
|
11.
|
Is the industrial
plant of the occupier
closed on Sunday/Holiday
|
Yes/No
|
|||||||||
12.
|
State working
season per year of
the Industrial
plant
Continuous/Batchwise …… Every year
a) No. of persons attending the
factory/ day.
b) No. of persons residing in the
premises.
c)Indicate the
present use of the
land in the vicinity(5 Kms radius of the site)
|
Full Year
From
To
From
To
From To
From
To
i)Human settlements of mote
than 1000 population
(specify
population and
distance from the plant)
ii)Commercial
iii)Industrial
iv)Fisheries
v)sanctuary/Natural Parks/
Hills/Mountains
vi) Ancient Monuments.
|
|||||||||
13.
|
Climatological
& Meteorological
Data
a) Indicate the climatic conditions at the site(eg Arid, Semi Arid etc.,)
b) Precipitation, yearly average range
c) Temperature, Seasonal ranges
d) Average annual speed and direction of wind Humidity/Solar radiation
|
|
|||||||||
14.
|
Raw material used
in T/day or
Kg/day
|
Name
Source
Quantity
|
|||||||||
15
|
Products/By
products/waste
material in T/day or Kg/day
|
|
|||||||||
16.
|
Complete flow chart
giving description and chemical processes if any as per Annexure-I
|
|
|||||||||
17.
|
Fuel Consumption
in T/day
|
|
|||||||||
|
Fuel
|
Coal
|
Fuel Oil
|
Diesel
|
Natural Gas
|
Wood
|
Others specify
|
||||
1. Daily Consumption in tonnes
|
|
|
|
|
|
|
|
||||
2. Calorific value
|
|
|
|
|
|
|
|
||||
3. Ash Content %
|
|
|
|
|
|
|
|
||||
4. Sulphur content %
|
|
|
|
|
|
|
|
||||
5. Others specify
|
|
|
|
|
|
|
|
||||
18.
|
Furnaces/Cupolas.
(a) No.of furnaces/cupolas installed
(b) Date of installation
(c) Capacity
(d) Purpose used
(e) Stack data
i)
Height
ii)
Diameter
iii)
Temperature
iv)
Flow rate
|
Yes No
|
|||||
19.
|
Boilers
Yes
No
a) No.of boilers
i) Installed……………… ii) In use
b) Type …………………..
c) Capacity ……………..
d) Method of fuel charging ……………..
i. Oil/gas Burner
ii. Grate
Charging(manual/mechanical)
iii. Pulverised coal
charging
(e) Quantity of fuel used in boilers ......
(f) Stack data
Height
i)Above the roof Mtrs …
ii)Above the ground
level .... Mtrs …
Diameter
:
Temperature :
Flow rate :
Stack Top :a). Round or circular
b) Inside
dimensions at top
|
||||||
20.
|
Emission control
equipment for air pollutants
Existing Not
Existing
Proposed
i)
Existing/Proposed
a)
Nature of the Air Pollution
Equipment….. :
b)
Efficiency
:
c)
Capacity
d)
Details of Air pollution
Proposed/Existing
Control System
e)
Give detailed specifications :
Of cyclones, Electro static
Precipitators, Scrubbers, Sag
Filters etc., on a separate sheet
f)
Any other monitoring facilities
available :
If so data available.
|
21.
|
Atmospheric.
Emissions
Stack No ………
Gas Quantity………………… m3/hr
Stack attached to
..................
Fuel Gas temp
………………..C
Stack height
.............................mts Exit Velocity of the
fuel gas ..................m/sec
a) Fuel Gas Emissions
b) Process Emissions
C) Particulate analysis
:
i)Size distribution in each stack :
ii)Chemical
composition :
d) Give details of Flue gas sampling
arrangements :
e) Give details of Laboratory facilities :
available for analysis of emissions.
f) Is there sufficient space available for :
installing Air Pollution Control Equipment.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
22.
|
Solid Wastes
Yes
No
a)Nature..........
b)Quantity .............
c)Mode of
disposal .......
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
23.
|
Any relevant
information not covered in the above items :
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
24.
|
Water consumption
a)Quantity per month or day,
b)Source
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
25.
|
Waste Water generated
Yes No
a) Quantity per month or day :
b) Disposal to
River Nallah Municipal
Server
c) Treatment of
Waste water
Existing Not
Existing
Proposed Not
Proposed
d) Waste Water characteristics (if available):
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
26
|
|
Before Treatment
|
After Treatment
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
i) B.O.D
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
ii) C.O.D
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
iii) Suspended Solids
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
iv) Heavy Metals (Specify)
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
v) Toxic Chemicals (Specify)
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
vi)Other (Specify)
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
27.
|
State the total quantity of air
handled by ventilation equipment so also specify size and No. of equipments
installed to be installed
(a)
Location and Dimension of Outlets
i)
Fuel Gas Emissions
ii) Process Emissions
ii)Particulate Analysis
a) Size distribution
b) Chemical Composition
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
28.
|
Give the following details
a)Total investment in the factory
and the year of investment.
b) The estimated expenditure for
implementing the project
c)Expenditure incurred to date
and process achieved
(Physical) for air pollution
control, if any and the year /
years of investments-along
with physical process
achieved:
(The Firm should give details of action taken
to date and the expenditure incurred and the time requires for completion of
the scheme)
d) Annual operation and maintenance of air pollution
control plant. If any
e) Further action that is being taken by the firm to
control Air Pollution.
|
|
29.
|
Other relevant information, if any
|
|
Signature
Name & Address of the applicant on
Behalf of the name & address of the firm
Explanatory Note for filling in the Form and
the Annexure
The notes are given
only for those items for which explanation in considered desirable.
Form :
1&2
|
Here mention the name of the owner of the
land/ premises. if other than the applicant industry or factory in
continuation of legal business as per Air (Prevention and control of
Pollution) Act, 1981. If I and/premises belong to the factory/industry say SELF.
|
3
|
Here
mention the date upto which the consent is sought for.
|
Annexure to Form :
Existing
means that which is in operation at the time of applying for the consent Now
means that which will be brought into operation in future. Altered Means that
which has been modified due to change in quality and/or quantity of emission,
arrangement and/or point of emission etc.
Item No.1
|
Here mention name of the owner of the land/premises if
other than the applicant industry or factory in continuation of legal business as
per Air (Prevention and Control Pollution) Act, 1981. If land/premises belong
to the factory/industry say SELF.
|
Item No. 2
|
Here give the registered name of the
industry/institution/factory/local bodies etc., under which the business is carried
out.
|
Item No. 2 (a)
|
Under items 2(a) & 3(a), any further changes.
|
Item No. 3 (a)
|
After the consent was granted it should be notified to
the State Board concerned, by the industry, for their information and to take
action if required at appropriate time for any default on the part of the industry.
|
Item No. 9
|
Applicable to only those areas which are prohibited
areas such as the ordinance factories / mint etc.
|
Item No. 13(c).
(d)
|
Here state the temperature in °C in Summer, Winter, Monsoon
& Post monsoon seasons.
Here state the seasonal average wind direction and speed
in and around the site of the plant.
The above information can be had from representative, Meteorological
Centre.
|
Item
No. 21
|
Analysis of the flue gas- emissions, process emission
and particulates should be done for each stack emission, wherever stacks are
not provided, the top floor specific pollutants conc. should be reported.
Chemical analysis of the particulate
matter in the emission should be furnished giving details such as organic
matter, metals, non-metals radioactive substances, asbestos, silicates etc..
|
Item No. 26
|
Here state the detailed specifications of control system
used or proposed to be used with efficiency. Also, furnish the lay out of the
Control system with dimensions.
|
Item No. 27
|
Here state the total quantity of ventilation air handled
by equipments such as roof extractors, evaporative coolers etc.
|
No comments:
Post a Comment