Issue of Air Consent forms for obtaining consent for operation



 


Lr.No.44119/PCB/JA/TS/2004,                                                                                       Date :___

To



Sir,

Sub:-
Issue of Air Consent forms for obtaining consent for operation – Reg.
Ref:-
Your Lr.No ___                                                  dt. _______


While acknowledging the receipt of the Demand Draft for Rs. 50/- through your letter cited, I enclose a set of Consent forms in quadruplicate. You are informed that, as per Section 21 of the Air(Prevention and Control of  Pollution) Act, 1981 as amended, it is obligatory on the part of the person seeking Consent of the Board under Section 21 of the Air(Prevention & Control of  Pollution) Act, 1981 to ensure that his application for grant of Consent for Operation should accompany with fees at the rates shown overleaf as per the A.P Gazette Notification Part-1, dt:18.12.1997.

You are requested to submit the application in triplicate duly filled in along with Consent fee as per the rates mentioned in the above Gazette Notification at concerned Regional Office of A.P. Pollution Control Board for further necessary action. The criteria for fixing the Consent fee is the total investment of the industry. The total investment should be reckoned as the entire investment including the cost of Land and Building on the industry, but excluding the working capital. The depreciation on industry should not be taken in to consideration, in the case of already established industries. In case the industry had expanded / proposed to go in for expansion, the cost of expansion should also be taken into consideration.

The prescribed Consent fee is be paid by crossed Demand Draft drawn on any Scheduled bank in favour of A.P. Pollution Control Bard payable at respective Head Quarters of concerned Regional Office.
You can apply for the maximum revised validity periods as per the following table:

SI.
No.
Item
Maximum Validity Period
1
CFO issuance for first time after obtaining CFE irrespective of category of unit
1 year
2
Red Category units
2 years
3
Orange Category units
3 years
4
Green Category units
5 years
5
Units with ISO 14000 certificate irrespective of category (not for fresh cases)
1 year over and above the above period  (SI.Nos. 2&3)
6
Cleaner Production Technology
3 years (Red Category only)
Note: To avail the maximum validity period, you are required to pay the Consent fee for the entire period along with the application.
                If the application is made for the renewal, you are requested to send a condition wise compliance report on the conditions stipulated in the earlier Consent order issued by the Board.

          Yours faithfully,


     For Member Secretary.
Encl: Consent form
         (in Quadruplicate)

A.P.Gazettee Notifiaction Part-1, date: 18.12.1997

Investment  Rs.  In  crores.

Red Category

Orange Category
Green Category
Industries generating Hazardous waste as per HWM & H Rules, 1989

Non-Hazardous Industries

Industries generating Hazardous waste as per HWM & H Rules, 1989
Non-Hazardous Industries
Industries generating Hazardous waste
as per HWM & H Rules, 1989
Rate of fee on investment (%)
(Rounding off to nearest Rs.100/-)
With Minimum amount of Rs.
Rate of fee on investment (%)  (Rounding off to nearest Rs.100/-)
With Minimum amount of Rs.
Rate of fee on investment (%) (Rounding off to nearest Rs.100/-)
With Minimum amount of Rs.
Rate of fee on investment (%) (Rounding off to nearest Rs.100/-)
With Minimum amount of Rs.
Rate of fee on investment (%) (Rounding off to nearest Rs.100/-)
With Minimum
amount of Rs.
0 to 0.025
0.2000000
0.00
0.0150000
0.00
0.1000000
0.00
0.750000
0.00
0.500000
0.00
Above 0.025 to 0.25
0.0400000
500.00
0.0300000
400.00
0.0200000
300.00
0.0150000
200.00
0.0100000
100.00
Above 0.25 to 0.50
0.0250000
1000.00
0.0187500
800.00
0.0125000
500.00
0.0093500
400.00
0.0062500
300.00
Above 0.50 to 1.00
0.0250000
1300.00
0.0187500
1000.00
0.0125000
700.00
0.0093500
500.00
0.0062500
400.00
Above 1.00 to 3.00
0.0250000
2500.00
0.0187500
1900.00
0.0150000
1300.00
0.0093500
1000.00
0.0062500
700.00
Above 3.00 to 5.00
0.0300000
7500.00
0.0225000
5700.00
0.0150000
3800.00
0.0112500
2800.00
0.0075000
1900.00
Above 5.00 to 10.00
0.0300000
15000.00
0.0225000
11300.00
0.0150000
7500.00
0.0112500
5700.00
0.0075000
3800.00
Above 10.00 to 25.00
0.0150000
30000.00
0.0112500
22500.00
0.0075000
15000.00
0.0056000
11300.00
0.0037500
7500.00
Above 25.00 to 50.00
0.0100000
37500.00
0.0007500
28200.00
0.0050000
18800.00
0.0037500
14000.00
0.0025000
9400.00
Above 50.00 to 100.00
0.0750000
50000.00
0.0062500
37500.00
0.0037500
25000.00
0.0028000
18800.00
0.0018750
12500.00
Above 100.00 to 500.00
0.0030000
75000.00
0.0022500
62500.00
0.0015000
37500.00
0.0011000
28000.00
0.0007500
18800.00
Above 500.00 to 1000.00
0.0025000
150000.00
0.0187580
112500.00
0.0012500
75000.00
0.0009350
55000.00
0.0006250
37500.00
Above 1000.00 to 5000.00
0.0070000
250000.00
0.0005250
187500.00
0.0003500
125000.00
0.0002625
93500.00
0.0001750
62500.00
Above 5000.00 to 10000.00
0.0005000
350000.00
0.0003750
262500.00
0.0002500
175000.00
0.0001875
131300.00
0.0001250
87500.00
Above 10000.00 to 20000.00
0.0005000
500000.00
0.0003750
325000.00
0.0002500
250000.00
0.0001875
187500.00
0.0001250
125000.00
Above 20000.00
0.0050000
1000000.00
0.0003750
750000.00
0.0002500
500000.00
0.0001875
375000.00
0.0012500
250000.00

Note:   Consent for Operation / Renewal fee has to be paid annually, under Water Act,1974 and Air Act,1981 separately with the above rates, if the industry is having both Air & Water pollution. If any industry is having water pollution only, they have to pay only one fee with the above rates. Similarly if any industry is having only Air pollution they have to pay only one fee with above rates. The Hazardous Waste generating industries have to pay Consent for Operation / renewal  fee under Water Act and Air Act separately and they need not pay any separate fees for the authorizations to be issued under the Hazardous Waste (Management & Handling) Rules, 1989.


                                                                                       ORIGINAL                                              PRICE RS.50/-
                                                                                                                                                                For Member Secretary

FORM-1
APPLICATION FOR CONSENT FOR EMISSION UNDER SECTION (21) OF THE ACT
(SEE CHAPTER-11)
To be submitted in Triplicate


                Application for Consent emissions in (1)__________________________________
Area which is the “Air Pollution Control Area” notified under Section ________________________
Of the Act under Government Gazette Notification No. __________________________________
Industry specified schedule________________________________________________________
(i)
(a) Area Code No.______________________________
dated___________________

(b) Grid Code No.______________________________
Dated___________________

From:        _________________________________
                     __________________________________
                     __________________________________


To
THE MEMBER SECRETARY
A.P. Pollution Control Board,
Paryavarana Bhavan,
A3, IE, Sanathnagar, Hyderabad.

Sir,

                                I/We apply for CONSENT under Section(21) of the Air(Prevention and Control of Pollution) Act, 1981( 14 of 1981) to make emission from industrial plant owned by (1) or occupied by (2)_____________________________________________________________________________________________________________________________________________________for a
Period upto_____                   .

(3)                    I/We further declare that the information furnished in the Annexure/Appendices and Plans is correct to the best of my/our knowledge.
(4)               I/We herby submit that in case of change either of the point, or the quantity of emission or its quality a fresh application for CONSENT shall be made and until such consent is granted, no change shall be made.
(5)               I/We hereby agree to submit to the Board, an application for renewal of CONSENT one month in advance of the date of expiry of the consented period for emission, if to be continued thereafter.
(6)               I/We undertake to furnish any other information with in one month of its being called by the Board.
(7)               I/We enclosed a demand draft of Rs._                                  __ towards the prescribed consent application fee.
(8)               The Annexure, appendices, other particulars and plans are attached herewith in triplicate.
Accompaniments :

i)
Index/Site plan

ii)
Topographical map

iii)
Detailed layout plan of different processes and point sources of Emission and position of stacks
and Chimneys

iv)
Process flow Sheet

v)
Latest Analysis Report

vi)
Details of Air Pollution Control devices provided or proposed to be provided.

vii)
Ambient Air Quality Report if available.

viii)
Draft No.___________________________________________Dated_________
For Rs.___________________________________________Drawn on_______
________________________________________________as consent fee.

       
  














Signature

Name of the applicant

Address of Applicant





                                       
                                                        ANNEXURE TO FORM 1
                                                                        CHIMNEY
                                                                                                        Existing :
                                                                                                        New       :
                                                                                                        Altered   :

Note: Any Applicant knowingly giving incorrect information or suppressing any information thereto 
          shall be liable for action under the provisions of the Act.
          While filling this Annexure the applicant shall for such of the items not pertaining to his   
          activity shall state not applicable against the relevant item and shall not leave it blank.


1.
(a) Full name of the applicant with address



(b) Name and Telephone No. of persons incharge of the premises



2.
(a)  Full name of the industrial   plant with address




(b) Full name and address of the occupier (defined in the Act ) as Registered with the Director of Factories & Boilers of the State or with any other competent authority of the state.





                                                             Tel. No.
3.
(a) Give Revenue / City Survey No. of the Land ? Premises for which the application is made.
District                                            Taluk
Town                                              Village
City Survey No                               Area in Hectares


(b) Magisterial Jurisdiction of the industry (premises) for purposes of prosecution case under the Act and also the name & address of the Police station under the industry (Premises) falls for all criminal cases connected with the Water Act, 1974 or Air Act, 1981.












4.
State month and year in which the industrial plant was actually put into commission or is proposed to be put into commission/or the month and year from which the local body is functioning









5.
(a) State the civil/Military       Defence/
Industrial Estate etc., under.
Whose   administrative
jurisdiction            the          occupiers
industrial plant is situated.
Collectorate :
Corporation:
Municipality:
Village Panchayat:
Cantonment:
Defence Department:
Port Trust:
State Government:
Prohibited Area:
Central Government:
Airport Authority or specify any other:


(b) Attach map showing  topographical features of the area.



6.
Elevation above mean sea




7.
Present use. of the Land
Agricultural
Forest
Grazing
Settlement
Fallow         

8.
Indicate the nature of topography                Plains
Surrounding the site.
Plains
Valley
Hilly
River Basin
Coastal
Estuarine
Land-Locked

9.
(a) State whether the industrial plant has been declared as prohibited area.
Yes/No
(b) If Yes, State the name of the authority and furnish a certified copy of the order which the area has been declared as prohibited.                                                           

10.








What of the following features exist
within 20 Kms of the site
Human settlement: specify
(Population and distance from the Plant)
Agriculture : specify crops
Grazing land / Fisheries
Forest/Sanctuary/National Park/
Nallahs/Streams/Rivers/
Ponds/Lakes/Dams/Estuary/
Sea/Hills/Mountains/industries
Specify ancient Monuments/Tourism area,


11.
Is the industrial plant of the occupier
closed on Sunday/Holiday

Yes/No


12.
State working season per year of
the Industrial plant




Continuous/Batchwise …… Every year
a) No. of persons attending the factory/ day.
b) No. of persons residing in the premises.
c)Indicate the present use of the
land in the vicinity(5 Kms radius of the site)


                                          Full Year
From                                                     To
From                                                     To
From                                                     To
From                                                     To





i)Human settlements of mote
   than 1000 population
(specify population and                                                               
distance from the plant)  
ii)Commercial
iii)Industrial
iv)Fisheries
v)sanctuary/Natural Parks/
   Hills/Mountains
vi) Ancient Monuments.


13.
Climatological & Meteorological
Data
a) Indicate the climatic conditions at the site(eg Arid, Semi Arid etc.,)
b)       Precipitation, yearly average range
c)       Temperature, Seasonal ranges
d)       Average annual speed and direction of wind Humidity/Solar radiation


14.
Raw material used in T/day or
Kg/day

Name                                   Source                         Quantity
15
Products/By products/waste
material in T/day or Kg/day


16.
Complete flow chart giving description and chemical processes if any as per Annexure-I


17.
Fuel Consumption in T/day




Fuel
Coal
Fuel Oil
Diesel
Natural Gas
Wood
Others specify


1. Daily Consumption in tonnes









2. Calorific value









3. Ash Content %









4. Sulphur content %









5. Others specify























18.
Furnaces/Cupolas.


(a)     No.of furnaces/cupolas installed
(b)     Date of installation
(c)     Capacity
(d)     Purpose used
(e)     Stack data
i)                     Height
ii)                   Diameter
iii)                  Temperature
iv)                 Flow rate
     Yes                                                 No













19.
Boilers                                                                    Yes                                                        No




a)       No.of boilers
          i) Installed………………                       ii) In use
b) Type …………………..
c) Capacity ……………..
d) Method of fuel charging ……………..
            i. Oil/gas Burner
            ii. Grate Charging(manual/mechanical)
           iii. Pulverised coal charging
(e) Quantity of fuel used in boilers ......
(f) Stack data
         Height
i)Above the roof                                      Mtrs …
ii)Above the ground level ....                   Mtrs …
             Diameter                 :
         Temperature           :
         Flow rate                    :
         Stack Top :a). Round or circular
                           b) Inside dimensions at top


20.
Emission control equipment for air pollutants
                             Existing                                          Not Existing                                Proposed








i)        Existing/Proposed
a)       Nature of the Air Pollution Equipment…..              :
b)       Efficiency                                                                 :
c)       Capacity                                                                    
d)       Details of Air pollution                                            Proposed/Existing
Control System
e)       Give detailed specifications                                      :
Of cyclones, Electro static
Precipitators, Scrubbers, Sag
Filters etc., on a separate sheet
f)        Any other monitoring facilities available                  :
If so data available.




21.
Atmospheric. Emissions
Stack No ………                                                    Gas Quantity………………… m3/hr
Stack attached to ..................                                  Fuel Gas temp ………………..C
 Stack height .............................mts                        Exit Velocity of the fuel gas ..................m/sec
a)       Fuel Gas Emissions

Type of fuel
C fuel/hr
Ash %
Analysis of the Fuel Gas

Nox

So2
HCL
CO

Particulate matter












b)       Process Emissions
SO2
CO2
CO
NOx
Analysis of vent gas in mg/m3
Hydrocarbon Particulars others specify










C) Particulate analysis                                                     :
i)Size distribution in each stack                                      :
ii)Chemical composition                                                     :
d) Give details of Flue gas sampling arrangements   :
e) Give details of Laboratory facilities                         :
available for analysis of emissions.
f) Is there sufficient space available for                            :
installing Air Pollution Control Equipment.
22.
Solid Wastes
                                                        Yes                                                            No
                                                  



a)Nature..........
b)Quantity .............
c)Mode of disposal .......
23.
Any relevant information not covered in the above items :

24.
Water consumption
a)Quantity per month or day,
b)Source





25.
Waste Water generated
                                                  Yes                         No




a) Quantity per month or day :
b) Disposal to
                                   River                                      Nallah                                 Municipal Server









c) Treatment of Waste water
        Existing                               Not Existing                              Proposed                     Not Proposed







d) Waste Water characteristics (if available):

26

Before Treatment
After Treatment

i) B.O.D



ii) C.O.D



iii) Suspended Solids



iv) Heavy Metals (Specify)



v) Toxic Chemicals (Specify)



vi)Other (Specify)



27.
State the total quantity of air handled by ventilation equipment so also specify size and No. of equipments installed to be installed
(a)     Location and Dimension of Outlets
i)                     Fuel Gas Emissions
Type of Fuel
Qty. of Fuel
S%
Ash%
Analysis of the fuel gas

Nox
So­­2
HCL
CO
Particulate matter

























































ii) Process Emissions
So2
CO2
Analysis of vent Gas in mg/nm3
Others Specify
NOX
Hydro carbons

particulars







































ii)Particulate Analysis
a)       Size distribution
b)       Chemical Composition


















28.
Give the following details
a)Total investment in the factory
and the year of investment.
b) The estimated expenditure for
implementing the project
c)Expenditure incurred to date
and process achieved
(Physical) for air pollution
control, if any and the year /
years of investments-along
with physical process
achieved:
(The Firm should give details of action taken to date and the expenditure incurred and the time requires for completion of the scheme)
d) Annual operation and maintenance of air pollution control plant. If any
e) Further action that is being taken by the firm to control Air Pollution.




29.
Other relevant information, if any























                                                                     

                                                                                                                    Signature
                                                                                                      Name & Address of the applicant on
                                                                                                              Behalf of the name & address of the firm

Explanatory Note for filling in the Form and the Annexure

The notes are given only for those items for which explanation in considered desirable.

Form :
1&2
Here mention the name of the owner of the land/ premises. if other than the applicant industry or factory in continuation of legal business as per Air (Prevention and control of Pollution) Act, 1981. If I and/premises belong to the factory/industry say SELF.

3
Here mention the date upto which the consent is sought for.
Annexure to Form :
Existing means that which is in operation at the time of applying for the consent Now means that which will be brought into operation in future. Altered Means that which has been modified due to change in quality and/or quantity of emission, arrangement and/or point of emission etc.

Item No.1
Here mention name of the owner of the land/premises if other than the applicant industry or factory in continuation of legal business as per Air (Prevention and Control Pollution) Act, 1981. If land/premises belong to the factory/industry say SELF.

Item No. 2
Here give the registered name of the industry/institution/factory/local bodies etc., under which the business is carried out.
Item No. 2 (a)
Under items 2(a) & 3(a), any further changes.
Item No. 3 (a)
After the consent was granted it should be notified to the State Board concerned, by the industry, for their information and to take action if required at appropriate time for any default on the part of the industry.

Item No. 9
Applicable to only those areas which are prohibited areas such as the ordinance factories / mint etc.

Item No. 13(c).
                  (d)
Here state the temperature in °C in Summer, Winter, Monsoon & Post monsoon seasons.
Here state the seasonal average wind direction and speed in and around the site of the plant.
The above information can be had from representative, Meteorological Centre.

Item No. 21
Analysis of the flue gas- emissions, process emission and particulates should be done for each stack emission, wherever stacks are not provided, the top floor specific pollutants conc. should be reported.
Chemical analysis of the particulate matter in the emission should be furnished giving details such as organic matter, metals, non-metals radioactive substances, asbestos, silicates etc..

Item No. 26
Here state the detailed specifications of control system used or proposed to be used with efficiency. Also, furnish the lay out of the Control system with dimensions.

Item No. 27
Here state the total quantity of ventilation air handled by equipments such as roof extractors, evaporative coolers etc.