5.Energy Audit of CW System.ppt 2374K View Download
please see the ppt also
Steps
Involved in Energy Audit
The major energy consuming equipments in the CW systems are:
•Cooling towers and fans
•Cooling water pumps
•Make up water pumps
•Condensers
The steps involved in conducting energy audit of cooling water
and cooling tower are:
•Data collection
•Observations and Analysis
•Exploration for energy conservation measures
•Report preparation
Exploration
of Energy Conservation Possibilities
•Internal Running Clearances: The internal running clearances
between rotating and non-rotating elements strongly influence the turbo
machine's ability to meet rated performance. Proper set-up reduces the amount
of leakage (re-circulation) from the discharge to the suction side of the
impeller
•Reducing work load of pumping: Reducing of obstructions in the
suction / delivery pipes thereby reduction in frictional losses. This includes
removal of unnecessary valves of the system due to changes. Even system and
layout changes may help in this including increased pipe diameter. Replacement
of components deteriorated due to wear and tear during operation, modifications
in piping system
|
EHSQLaw Greenko -AMGreen Group (Env-Energy,Health,Safety,Security ,Social Ac.Quality-Lab) Tech.Serv.
EHSQL team building , AMGreen and GreenkoGroupFounder Dr. Anil Chalamalasetty and Shri Mahesh Koli Sir,Shri Gautam Reddy,Dr.K.Pradeep,Dr. Rambabu P.,Shri H.Menon,Shri Ch.Srinivas Rao,Shri N. SeshaGiri, Shri GSV Raja,Shri GVS Anand,Shri K.GangadharRao,Shri Madhav KG Dr.V.S.John,Shri Badusha V. Shaik,Shri S. Simhachalam, Shri PVSN Raju,Shri B.B.K U.Maheswar Rao,Shri S.Tatayya,Shri P.Nagaraju,Shri S.K. Dash,Shri CH ApplaRaju,Shri LVV Rao, Shri P. Srinivaslu, EHSQL by Dr.A.N.GIRI-37.3Lakhs Viewed
Saturday, 15 December 2012
ENERGY AUDIT OF CONDENSER AND CONDENSER COOLING WATER SYSTEM
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment