Monday, 17 December 2012

Mega-capacity Urea Plants – TEC’s Approach

Mega-capacity Urea Plants
– TEC’s Approach
H. MORIKAWA, E. SAKATA, Y. KOJIMA, G. NISHIKAWA
Toyo Engineering Corporation
2-8-1 Akanehama, Narashino-shi, Chiba 275-0024, Japan
In accordance with increased production capacity of the recent ammonia plants, the production capacity of urea plant also becomes large. To meet such demands, TEC has established the design of 3,500 metric tons per day (mtpd) urea plants based on the ACES Urea Process by confirming all considerable aspects of process, equipment fabrication, construction and so forth. This paper reports how TEC evaluates the investigation results and concluded that the Mega-capacity Urea Plant design and construction in comparison with currently operated 1,750 mtpd ACES Process urea plants can be realized.
2002_Mega-capacity_Urea_Plants.pdf2002_Mega-capacity_Urea_Plants.pdf
884K   View   Download  

No comments:

Post a Comment