πππ πππππ π - πππππππ
π€π’π€π§
; Sling complex loads and communicate during crane operations
; Lift and move a load in suspension using a mobile crane
; Participate in groups and/or teams to recommend solutions to problems
; Plan, organise and control the erection, alteration/repositioning and dismantling of load bearing scaffolding
; Transfer a load by means of snatching and anchoring
; Manoeuvre a load by utilising a temporary construction
; Manage the transportation of dangerous goods π€π’π€π§ © πΉπΆπΎπ πΉππ π―ππΆπΎππΎππ
Repair, replace and/or adjust helicopter cargo suspension hooks and rescue joists
; Participate in groups and/or teams to recommend solutions to problems
; Plan, organise and control the erection, alteration/repositioning and dismantling of load bearing scaffolding Plan, organise and control the erection, alteration/repositioning and dismantling of access scaffolding
; Plan, organise and control the erection, alteration/repositioning and dismantling of suspended scaffolding
; Transfer a load by means of snatching and anchoring
; Manoeuvre a load by utilising a temporary construction
; Examine winder rope attachments
; Transport material and equipment in a shaft barrel
; Terminate a rope end by means of capping π€π’π€π§ © πΉπΆπΎπ πΉππ π―ππΆπΎππΎππ
; Replace a winder rope
; Pilot material and equipment in a shaft
; Terminate and secure back ends of a winder rope
No comments:
Post a Comment