Friday, 10 January 2025

𝐍𝐐𝐅 𝐋𝐄𝐕𝐄𝐋 πŸ‘ - π‘πˆπ†π†πˆππ†

 πππ… 𝐋𝐄𝐕𝐄𝐋 πŸ‘ - π‘πˆπ†π†πˆππ†







𝟀𝟒𝟀𝟧 

; Sling complex loads and communicate during crane operations

; Lift and move a load in suspension using a mobile crane

; Participate in groups and/or teams to recommend solutions to problems

; Plan, organise and control the erection, alteration/repositioning and dismantling of load bearing scaffolding

; Transfer a load by means of snatching and anchoring

; Manoeuvre a load by utilising a temporary construction

; Manage the transportation of dangerous goods 𝟀𝟒𝟀𝟧 © 𝐹𝒢𝒾𝓇 𝐹𝑒𝑒 𝒯𝓇𝒢𝒾𝓃𝒾𝓃𝑔

Repair, replace and/or adjust helicopter cargo suspension hooks and rescue joists

; Participate in groups and/or teams to recommend solutions to problems

; Plan, organise and control the erection, alteration/repositioning and dismantling of load bearing scaffolding Plan, organise and control the erection, alteration/repositioning and dismantling of access scaffolding

; Plan, organise and control the erection, alteration/repositioning and dismantling of suspended scaffolding

; Transfer a load by means of snatching and anchoring

; Manoeuvre a load by utilising a temporary construction

; Examine winder rope attachments

; Transport material and equipment in a shaft barrel

; Terminate a rope end by means of capping 𝟀𝟒𝟀𝟧 © 𝐹𝒢𝒾𝓇 𝐹𝑒𝑒 𝒯𝓇𝒢𝒾𝓃𝒾𝓃𝑔

; Replace a winder rope

; Pilot material and equipment in a shaft

; Terminate and secure back ends of a winder rope

No comments:

Post a Comment