Friday, 10 January 2025

๐๐๐… ๐‹๐„๐•๐„๐‹ ๐Ÿ‘ - ๐‘๐ˆ๐†๐†๐ˆ๐๐†

 ๐๐๐… ๐‹๐„๐•๐„๐‹ ๐Ÿ‘ - ๐‘๐ˆ๐†๐†๐ˆ๐๐†







๐Ÿค๐Ÿข๐Ÿค๐Ÿง 

; Sling complex loads and communicate during crane operations

; Lift and move a load in suspension using a mobile crane

; Participate in groups and/or teams to recommend solutions to problems

; Plan, organise and control the erection, alteration/repositioning and dismantling of load bearing scaffolding

; Transfer a load by means of snatching and anchoring

; Manoeuvre a load by utilising a temporary construction

; Manage the transportation of dangerous goods ๐Ÿค๐Ÿข๐Ÿค๐Ÿง © ๐น๐’ถ๐’พ๐“‡ ๐น๐‘’๐‘’ ๐’ฏ๐“‡๐’ถ๐’พ๐“ƒ๐’พ๐“ƒ๐‘”

Repair, replace and/or adjust helicopter cargo suspension hooks and rescue joists

; Participate in groups and/or teams to recommend solutions to problems

; Plan, organise and control the erection, alteration/repositioning and dismantling of load bearing scaffolding Plan, organise and control the erection, alteration/repositioning and dismantling of access scaffolding

; Plan, organise and control the erection, alteration/repositioning and dismantling of suspended scaffolding

; Transfer a load by means of snatching and anchoring

; Manoeuvre a load by utilising a temporary construction

; Examine winder rope attachments

; Transport material and equipment in a shaft barrel

; Terminate a rope end by means of capping ๐Ÿค๐Ÿข๐Ÿค๐Ÿง © ๐น๐’ถ๐’พ๐“‡ ๐น๐‘’๐‘’ ๐’ฏ๐“‡๐’ถ๐’พ๐“ƒ๐’พ๐“ƒ๐‘”

; Replace a winder rope

; Pilot material and equipment in a shaft

; Terminate and secure back ends of a winder rope

No comments:

Post a Comment