This is a complete breakdown of Pre-Startup Safety Review (PSSR) - one of the most critical elements of Process Safety Management. The slogan at the top says it all: Right checks. Safe start. No surprises

 This is a complete breakdown of Pre-Startup Safety Review (PSSR) - one of the most critical elements of Process Safety Management. The slogan at the top says it all: Right checks. Safe start. No surprises.



Here is what the infographic is telling you:


1. WHAT IS PSSR?

It's a systematic final check to verify that everything is Safe, Ready, and Compliant BEFORE you introduce hazardous chemicals, energy, or start up any process, facility or equipment. It's the last barrier between construction/maintenance and operation.


In OSHA PSM 29 CFR 1910.119, it's Element 14 - and it's mandatory.


2. KEY PURPOSES - Why we do it

Prevent incidents, injuries and fatalities

Verify that all safety systems and safeguards are actually in place and working

Ensure you are compliant with legal, regulatory and company requirements

Protect people, environment and assets


3. WHAT DOES A PSSR CHECK? - The 8 Pillars


The infographic groups it into 8 checks:


1. Documentation & Procedures

Are the papers correct? P&IDs, process flow diagrams, operating procedures, safety procedures, work permits, and most importantly - has the Management of Change (MOC) been closed?


2. Process & Equipment

Is the hardware ready? Equipment integrity, pressure relief systems, process control systems, calibration & testing records, and correct line-up / isolation status.


3. Safety Systems & Emergency Preparedness

Will it protect us if something goes wrong? Fire and gas detection, shutdown and isolation systems, emergency response plans, alarms and communication, and firefighting equipment availability.


4. People & Competence

Are the people ready? Only trained and authorized personnel, competency verified, induction and toolbox talks done, contractor management in place, and clear roles and communication.


5. Permits & Isolation

Is energy controlled? Valid work permits, isolation and LOTO (Lockout/Tagout), blinding and labeling, and zero energy verification.


6. Environment Compliance

Are we environmentally safe? Emission controls, waste management, environmental monitoring, regulatory compliance, and community / stakeholder issues addressed.


7. Housekeeping & Facility Readiness

Is the site clean and accessible? Clean and clear work areas, proper material storage, good lighting and ventilation, access and egress clear, signage and barricades in place.


8. Hazards & Risk Status

Is the risk known? Risk assessments updated, no outstanding action items, any change in conditions captured, and new hazards identified.


4. THE PSSR PROCESS - How it flows


1. PREPARE: Review documents, identify scope and create a checklist.

2. CONDUCT REVIEW: Go to field, inspect, verify, test and discuss with operations, maintenance, HSE teams.

3. CLOSE OUT: Address all findings, complete action items and obtain formal approval to start.

4. STARTUP: Only proceed when ALL items are closed and verified safe.


The Golden Rule at the bottom:

No PSSR, No Startup!


That leads to: Safe People, Healthy Environment, Reliable Operations.


In practice, you trigger a PSSR after: a new installation, a modification covered by MOC, after a turnaround/shutdown, after a prolonged outage, or introduction of a new chemical/process.


This poster is perfect for a toolbox talk or for your PSSR field team - you can use those 8 pillars as your actual checklist. ⚠️🦺🚦🚨🗼🏗️🚥🌡️⛑️🚧